8506 Stillwood Ln
Austin, TX 78757
Roof replacement and bathroom remodel at 8506 Stillwood Ln
Permits indicate a roof replacement with new decking at 8506 Stillwood Ln, permitted June 14, 2026. Earlier permits from December 13, 2023, cover a like-for-like tub-to-tub conversion.
Summarized from City of Austin records · updated Jun 14, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jun 14, 2026
- since Dec 13, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: roof replacement with new decking
- AppliedJun 12, 2026
- IssuedJun 14, 2026
- WorkJun '26 – Jul '26
- Final inspectionJul 10, 2026
Passed final inspection Jul 10, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
3 projectsExpress: roof replacement with new decking
Express: roof replacement with new decking
City of Austin permitBuilding PermitFinal- Record
- 2026-075288 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express tub-to-tub conversion (like to like remodel)
Express tub-to-tub conversion (like to like remodel)
City of Austin permitBuilding PermitFinal- Record
- 2023-155965 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express tub-to-tub conversion (like to like remodel)
Express tub-to-tub conversion (like to like remodel)
City of Austin permitPlumbing PermitFinal- Record
- 2023-155965 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8506 Stillwood Ln
What work is planned at 8506 Stillwood Ln?
City of Austin permits indicate a roof replacement with new decking and a like-for-like tub-to-tub conversion.
When was the roof replacement permitted at 8506 Stillwood Ln?
The roof replacement permit, 2026-075288 BP, was filed June 14, 2026, and is marked final.
Is a new home being built at 8506 Stillwood Ln?
The records provided do not show a new-home construction permit. They show a roof replacement and a tub-to-tub conversion.
What does the tub-to-tub permit at 8506 Stillwood Ln cover?
Permit 2023-155965 BP describes an express, like-for-like tub-to-tub conversion. It was filed December 13, 2023, and is marked final.
Are there permits for plumbing work at 8506 Stillwood Ln?
Yes. Plumbing permit 2023-155965 PP covers the tub-to-tub conversion and was filed December 13, 2023. It is marked final.
Also being built nearby
All of 78757- 8509 Stillwood LnOct 26, 2026To install 16 solar modules and 1 battery · 40 m away
- 8600 Stillwood LnMay 26, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 1.5 ton heat pump system · 45 m away
- 8509 Rockwood LnSep 16, 2026Cdp - request to disconnect. installation of a 200 amp automatic transfer switch for a generator · 51 m away
- 8516 Rockwood LnNov 21, 2025Installation of 8.80kw solar pv system · 55 m away
- 8514 Rockwood LnJun 13, 2025Replacement of complete existing central heat and air system with or without duct work · 69 m away
- 8503 Stillwood LnJun 23, 2026Interior remodel and conversion of two porches. rear of home and front porch to be converted into living areas 182 sq ft interior remodel and attached storage remodel existing covered porch enclosure · 74 m away
- 8512 Rockwood LnJun 29, 2026Irrigation install · 87 m away
- 8600 Primrose LnAug 27, 2024Replacement of complete existing central heat and air system with or without duct work · 87 m away
- 8419 Stillwood LnOct 1, 2026Temporary meter loop existing meter loop to be removed to make room for home addition will be a cut over · 98 m away
- 8414 Stillwood LnOct 30, 2024Replacement of an existing water heater · 99 m away
- 8510 Rockwood LnJun 5, 2025Replacement of complete existing central heat and air system with or without duct work · 101 m away
- 8602 Primrose LnSep 17, 2024Emergency repairs to install a missing lug in the meter can · 105 m away