1004 Silbury Dr
Austin, TX 78758
1004 Silbury Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1004 Silbury Dr, Austin, TX 78758. The most recent, filed May 3, 2025, covers: “Upgrade main electric service to 200 amps - underground”.
Compiled from City of Austin records · updated May 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 3, 2025
- since May 3, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrade main electric service to 200 amps - underground
- AppliedApr 29, 2025
- IssuedMay 3, 2025
- WorkMay '25 – Jul '25
- Final inspectionJul 18, 2025
Passed final inspection Jul 18, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectUpgrade main electric service to 200 amps - underground
Upgrade main electric service to 200 amps - underground
City of Austin permitElectrical PermitFinal- Record
- 2025-052802 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1004 Silbury Dr
What is being built at 1004 Silbury Dr?
The latest filing (City of Austin permit 2025-052802 EP, May 3, 2025) covers upgrade main electric service to 200 amps - underground.
How many permits and filings does 1004 Silbury Dr have?
1 filing across 1 project, from May 3, 2025 to May 3, 2025.
Is there other construction near 1004 Silbury Dr?
Yes. Nearby filings include 1005 Silbury Dr (replacement of complete existing central heat and air system with or without duct work, Feb 14, 2025); 1007 Silbury Dr (replacement of complete existing central heat and air system with or without duct work, Nov 16, 2023); 1009 Silbury Dr (disconnect/reconnect to upgrade services. shutdown required install feed through panel, Mar 4, 2025).
How do I get alerts for new permits at 1004 Silbury Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 1005 Silbury DrFeb 14, 2025Replacement of complete existing central heat and air system with or without duct work · 44 m away
- 1007 Silbury DrNov 16, 2023Replacement of complete existing central heat and air system with or without duct work · 48 m away
- 1009 Silbury DrMar 4, 2025Disconnect/reconnect to upgrade services. shutdown required install feed through panel · 53 m away
- 11821 Eubank DrApr 23, 2024Replacement of an existing water heater (40 gallon natural gas) · 87 m away
- 900 Silbury DrNov 4, 2024Express: bathroom remodel-replace 1 tub t valve 1 shower head wallboard and shower surround · 101 m away
- 11816 Eubank DrMar 19, 2026Replace breaker panel like for like 200amp with code updates · 106 m away
- 901 Silbury DrApr 17, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton 2 stage horizontal gas system · 114 m away
- 902 Huntridge DrAug 13, 2025Upgrade main electric service to 200 amps - underground replace sub panel · 115 m away
- 1104 Huntridge DrNov 20, 2024Install level 2 ev charger · 122 m away
- 1003 Huntridge DrJul 7, 2025Irrigation system installation · 129 m away
- 1001 Huntridge DrSep 22, 2025Replacement of complete existing central heat and air system with or without duct work · 133 m away
- 11815 Eubank DrFeb 20, 2026New meter and new breaker panel · 137 m away