10505 Robinwood Cir
Austin, TX 78758
Yard water line replacement permitted at 10505 Robinwood Cir
A City of Austin plumbing permit covers replacing the water line in the yard at 10505 Robinwood Cir. The permit was filed on December 26, 2025, and is listed as final.
Summarized from City of Austin records · updated Dec 26, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 26, 2025
- since Dec 26, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace water line in the yard
- AppliedDec 23, 2025
- IssuedDec 26, 2025
- WorkDec '25 – Jan '26
- Final inspectionJan 8, 2026
Passed final inspection Jan 8, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace water line in the yard
Replace water line in the yard
City of Austin permitPlumbing PermitFinal- Record
- 2025-161715 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10505 Robinwood Cir
What is happening at 10505 Robinwood Cir?
A City of Austin plumbing permit covers replacing the water line in the yard. The permit number is 2025-161715 PP.
When was the water line replacement permitted?
The permit was filed on December 26, 2025.
What is permit 2025-161715 PP for?
It is a City of Austin plumbing permit to replace the water line in the yard at 10505 Robinwood Cir.
Is a new home being built at 10505 Robinwood Cir?
The available permit describes a yard water line replacement, not new home construction.
What is the status of the plumbing permit?
The City of Austin record lists permit 2025-161715 PP as final.
Also being built nearby
All of 78758- 10404 Leaning Willow DrAug 3, 2025Replacement of complete existing central heat and air system with or without duct work · 32 m away
- 1723 Pine Knoll DrApr 25, 2024Replace the drain line via a tunnel under the foundation (up to 100 ft but most likely 60 -70 feet) · 68 m away
- 10306 Leaning Willow DrAug 5, 2024Replacement of complete existing central heat and air system with or without duct work · 71 m away
- 10405 Robinwood CirNov 4, 2024Replacement of complete existing central heat and air system with or without duct work · 73 m away
- 10512 Robinwood CirSep 2, 2025To replace all gas piping in single story home with csst and hard piping where codes apply · 74 m away
- 10424 Quail Ridge DrJun 8, 2026Remove and replace existing sewer yard line (only) · 75 m away
- 10304 Leaning Willow DrFeb 12, 2026Express: replace the hall bath toilet with an ada height type replace the kitchen sink and faucet replace the hall bath sink vanity and faucet replace four existing smoke detectors to code · 86 m away
- 1801 Pine Knoll DrJan 8, 2024Install evse at garage · 90 m away
- 10402 Robinwood CirSep 13, 2024Replacement of complete existing central heat and air system with or without duct work · 92 m away
- 10422 Quail Ridge DrNov 14, 2024Express: replace 1 window like for like · 98 m away
- 10300 Leaning Willow DrApr 28, 2025Replace meter and main service panel to 200 amps with main breaker · 122 m away
- 10418 Quail Ridge DrApr 6, 2026Replacement of an existing water heater replace 50-gallon gas water heater located in garage · 139 m away