groundranger
Recent · latest filing Jul 2025Residential

1107 Plymouth Dr

Austin, TX 78758

1107 Plymouth Dr: 2 projects on record

City of Austin lists 2 filings across 2 projects at 1107 Plymouth Dr, Austin, TX 78758 since January 11, 2024. The most recent, filed July 7, 2025, covers: “Emergency replacing damaged material in panel”.

Compiled from City of Austin records · updated Jul 7, 2025

Projects
2
2 filings
Latest filing
Jul 7, 2025
since Jan 11, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Emergency replacing damaged material in panel

  1. AppliedJul 2, 2025
  2. IssuedJul 7, 2025
  3. WorkJul '25 – Jul '25
  4. Final inspectionJul 10, 2025

Passed final inspection Jul 10, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Emergency replacing damaged material in panel

    Emergency replacing damaged material in panel

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Request to disconnect replacing 125amp main panel for 125 main panel like for like

    Request to disconnect replacing 125amp main panel for 125 main panel like for like

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1107 Plymouth Dr

What is being built at 1107 Plymouth Dr?

The latest filing (City of Austin permit 2025-082393 EP, July 7, 2025) covers emergency replacing damaged material in panel.

How many permits and filings does 1107 Plymouth Dr have?

2 filings across 2 projects, from January 11, 2024 to July 7, 2025.

Is there other construction near 1107 Plymouth Dr?

Yes. Nearby filings include 1113 Plymouth Dr (we are converting a 1.5 bathroom to a 2 shower home. we have a shower that splits between 2 bathrooms and we look to add a shower to make the 2 areas 2 full bathrooms, Dec 4, 2024); 1100 Colony North Dr (93 tunnel below the foundation to replace entire cast iron drain system. 3 access holes - front/back/left, Apr 29, 2025); 1110 Colony North Dr (tunnel under the foundation to replace cast iron drain line for the kitchen drain and (1) bathroom by installing pvc, Jul 8, 2024).

How do I get alerts for new permits at 1107 Plymouth Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78758
Email me when a new permit is filed