1108 Chesapeake Dr
Austin, TX 78758
HVAC system replacement permitted at 1108 Chesapeake Dr
A permit covers replacement of the existing central heating and air system, with or without duct work, at 1108 Chesapeake Dr. The City of Austin permit was filed on May 28, 2026, and is listed as final.
Summarized from City of Austin records · updated May 28, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 28, 2026
- since May 28, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work hvac change out
- AppliedMay 26, 2026
- IssuedMay 28, 2026
- WorkMay '26 – Jun '26
- Final inspectionJun 8, 2026
Passed final inspection Jun 8, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work hvac change out
Replacement of complete existing central heat and air system with or without duct work hvac change out
City of Austin permitMechanical PermitFinal- Record
- 2026-065921 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1108 Chesapeake Dr
What is being built at 1108 Chesapeake Dr?
The City of Austin permit describes replacement of the existing central heat and air system, with or without duct work. It does not indicate new construction.
Is a new house being built at 1108 Chesapeake Dr?
The record is for an HVAC replacement, not a new house. It was filed on May 28, 2026.
When was the HVAC permit filed for 1108 Chesapeake Dr?
The City of Austin filed permit 2026-065921 MP on May 28, 2026.
What HVAC work is planned at 1108 Chesapeake Dr?
The permit describes replacing the complete existing central heat and air system, with or without duct work.
Is the permit for 1108 Chesapeake Dr approved?
The City of Austin lists permit 2026-065921 MP as final. It was filed on May 28, 2026.
Also being built nearby
All of 78758- 1106 Chesapeake DrDec 5, 2024200 amp overhead service replacement · 22 m away
- 8518 Bradford DrAug 26, 202555 trench to replace yard sewer. 40 tunnel below the foundation to replace entire cast iron drain system. 2 access holes- back and right side · 53 m away
- 8521 New Hampshire DrMar 12, 2024Replacement of an existing water heater · 86 m away
- 1106 Alden DrJun 17, 2026Change/upgrade main electrical service · 88 m away
- 8514 Bradford DrOct 20, 2026Gas test and repair at stove · 88 m away
- 1104 Alden DrNov 21, 2025Replacement of an existing water heater · 94 m away
- 1012 Chesapeake DrAug 19, 2025Excavate 62 tunnel to repair main drain line under house serving whole house · 104 m away
- 8517 New Hampshire DrNov 5, 2024Upgrade overhead 120/240 v 200 amp service to updated code. joe compton 512-504-6079 · 110 m away
- 8512 Bradford DrJul 26, 2024Replacing the main service and sub panel update devices in specific areas of house · 111 m away
- 1100 Alden DrDec 13, 2024Express: replace 3 windows like for like · 117 m away
- 8522 New Hampshire DrAug 5, 2025Panel and meter can upgrade 200 amps · 121 m away
- 8520 New Hampshire DrNov 21, 202516ft tunnel under foundation of home 40ft of yard line for sewer line replacement · 126 m away