11510 Bittern Holw
Austin, TX 78758
Electrical service upgrade at 11510 Bittern Holw
An electrical permit at 11510 Bittern Holw covers replacing the meter and exterior panel, upgrading service to 200 amps, and updating the interior subpanel, grounding and whole-home surge protection. The City of Austin permit was filed September 30, 2026, and is marked final.
Summarized from City of Austin records · updated Sep 30, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 30, 2026
- since Sep 30, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRequest to disconnect and reconnect. replace meter and exterior panel upgrading to 200 amp service. replacing interior sub panel updating grounding and installing whole home surge protection
- AppliedSep 28, 2026
- IssuedSep 30, 2026
- WorkSep '26 – Oct '26
- Final inspectionOct 22, 2026
Passed final inspection Oct 22, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectRequest to disconnect and reconnect. replace meter and exterior panel upgrading to 200 amp service. replacing interior sub panel updating grounding and installing whole home surge protection
Request to disconnect and reconnect. replace meter and exterior panel upgrading to 200 amp service. replacing interior sub panel updating grounding and installing whole home surge protection
City of Austin permitElectrical PermitFinal- Record
- 2026-127251 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11510 Bittern Holw
What work is being done at 11510 Bittern Holw?
The permit covers a meter and exterior panel replacement, a 200-amp service upgrade, interior subpanel and grounding updates, and whole-home surge protection.
Is a new home being built at 11510 Bittern Holw?
The record does not indicate new construction. It describes electrical upgrades at the address.
When was the electrical permit filed?
The City of Austin filed permit 2026-127251 EP on September 30, 2026.
What is the permit status for 11510 Bittern Holw?
The City of Austin permit record lists the status as final.
Is the electrical service being upgraded to 200 amps?
Yes. The permit description says the work includes upgrading to 200-amp service.
Also being built nearby
All of 78758- 11508 Bittern HolwJun 17, 2026Service upgrade from existing 125amp to new 225amp underground · 18 m away
- 11603 Hidden Quail DrAug 13, 2024Replacement of complete existing central heat and air system with or without duct work · 37 m away
- 11511 Hidden Quail DrJun 23, 2025Replacement of complete existing central heat and air system with or without duct work · 48 m away
- 11604 Bittern HolwSep 30, 2026Main panel changeout · 56 m away
- 1602 Jersey DrOct 4, 2024Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 11608 Bittern HolwFeb 13, 2025Replacement of complete existing central heat and air system with or without duct work · 91 m away
- 11611 Hidden Quail DrAug 22, 2024Express - tub/shower with acrylic shower base and walls replace valves and fixtures · 93 m away
- 11503 Hidden Quail DrOct 17, 2025Express - bathroom remodel replace 1 tub · 110 m away
- 11504 Hidden Quail DrAug 5, 2025Upgrade electrical service to 200 amps and install automatic transfer switch for future standby generator · 120 m away
- 11603 Ruffed Grouse DrOct 27, 2025Replacement of complete existing central heat and air system with or without duct work replacement of a/c system through austin energys weatherization assistance program · 123 m away
- 1609 Holstein DrSep 18, 2026Express: tub to shower conversion · 128 m away
- 11502 Hidden Quail DrNov 17, 2026Base: installing a backup battery system and additional meter socket · 135 m away