11800 Metric Blvd
Austin, TX 78758
11800 Metric Blvd: 3 projects on record
City of Austin lists 3 filings across 3 projects at 11800 Metric Blvd, Austin, TX 78758. The most recent, filed March 2, 2007, covers: “Replacing existing 7-eleven trade equipment; no exterior or hvac system changes; store to remain open; no structural changes”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 3
- 3 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacing existing 7-eleven trade equipment; no exterior or hvac system changes; store to remain open; no structural changes
- AppliedMay 9, 2022
- IssuedJul 11, 2023
- WorkJul '23 – Apr '24
- Final inspectionApr 18, 2024
Passed final inspection Apr 18, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
3 projectsReplacing existing 7-eleven trade equipment; no exterior or hvac system changes; store to remain open; no structural changes
Replacing existing 7-eleven trade equipment; no exterior or hvac system changes; store to remain open; no structural changes
City of Austin permitBuilding PermitFinal- Record
- 2022-104498 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11800 Metric Blvd
What is being built at 11800 Metric Blvd?
The latest filing (City of Austin permit 2022-104498 BP, July 11, 2023) covers replacing existing 7-eleven trade equipment; no exterior or hvac system changes; store to remain open; no structural changes.
How many permits and filings does 11800 Metric Blvd have?
3 filings across 3 projects, from March 2, 2007 to March 2, 2007.
What is being built near Stone Mesa in Austin?
11800 Metric Blvd is about 233 m from Stone Mesa (11900 Metric Blvd). Its latest filing is for replacing existing 7-eleven trade equipment; no exterior or hvac system changes; store to remain open; no structural changes.
Is there other construction near 11800 Metric Blvd?
Yes. Nearby filings include 11700 Metric Blvd (replace under ground gas piping system in the property *we are replacing the underground gas line. the gas meter is in the front of bld#3. we are planning to trench a new gas line through the property to the laundry/boiler building. the laundry/boiler bld is located in the center of the property. see photo showing the gas line routing we are proposing. the ug gas line needs to be replaced. we are pulling a permit for the gas line replacement, Jul 10, 2025); 11904 Sunhillow Bnd (amnesty co for duplex circa 1983, Jul 28, 2025); 2105 Gracy Farms Ln (stonehollow industrial park, Mar 2, 2007).
How do I get alerts for new permits at 11800 Metric Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 11700 Metric BlvdJul 10, 2025Replace under ground gas piping system in the property *we are replacing the underground gas line. the gas meter is in the front of bld#3. we are planning to trench a new gas line through the property to the laundry/boiler building. the laundry/boiler bld is located in the center of the property. see photo showing the gas line routing we are proposing. the ug gas line needs to be replaced. we are pulling a permit for the gas line replacement · 67 m away
- 11904 Sunhillow BndJul 28, 2025Amnesty co for duplex circa 1983 · 205 m away
- 2105 Gracy Farms LnMar 2, 2007Stonehollow industrial park · 211 m away
- 1911 Albury CvOct 8, 2024New electric vehicle charge installation for private resident use and 200-amp service upgrade for unit d · 214 m away
- 1909 Albury CvSep 11, 2024Interior remodel siding and window replacement for multifamily · 225 m away
- 11900 Metric Blvd · Stone Mesa LtdNov 26, 2024Interior remodel of existing restaurant space. add 13 feet hood work · 233 m away
- 11701 Metric BlvdSep 3, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system without duct work for unit 624 · 240 m away
- 11915 Stonehollow DrNov 9, 2026Adding additional ev chargers to the parking lot of the apartments outside. total of four pedestals in the parking lot · 264 m away
- 1903 Albury CvOct 16, 2024New electric vehicle charge installation for private resident use and 200-amp service upgrade for unit b · 268 m away
- 11712 Tallow Field WayMay 8, 2025Replacement of complete existing central heat and air system with or without duct work · 268 m away
- 1913 Prairie Knoll CtAug 13, 2026Replacement of complete existing central heat and air system with or without duct work · 278 m away
- 1909 Gracy Farms LnOct 13, 2026Express: full residential roof replacement within wui area. removing old covering and installing new covering · 296 m away
More gas stations & car washes in 78758, retail spaces in 78758.