1202 Artesian Cir
Austin, TX 78758
1202 Artesian Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 1202 Artesian Cir, Austin, TX 78758. The most recent, filed December 1, 2023, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Dec 1, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 1, 2023
- since Dec 1, 2023
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2023-153594 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1202 Artesian Cir
What is being built at 1202 Artesian Cir?
The latest filing (City of Austin permit 2023-153594 MP, December 1, 2023) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 1202 Artesian Cir have?
1 filing across 1 project, from December 1, 2023 to December 1, 2023.
Is there other construction near 1202 Artesian Cir?
Yes. Nearby filings include 1200 Artesian Cir (200amp main breaker panel and service replacement. austin energy is the electrical provider, Sep 1, 2026); 1204 Artesian Cir (replacement of complete existing central heat and air system with or without duct work, May 1, 2024); 8603 Brookfield Dr (35 tunnel to expose all cast iron sewer lines under home and replace with sch 40 pvc piping. tunnel access will be located in front of home. we will be trenching 40 from homeowner clean out to city tap to replace cast iron building sewer line, Apr 23, 2026).
How do I get alerts for new permits at 1202 Artesian Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 1200 Artesian CirSep 1, 2026200amp main breaker panel and service replacement. austin energy is the electrical provider · 26 m away
- 1204 Artesian CirMay 1, 2024Replacement of complete existing central heat and air system with or without duct work · 32 m away
- 8603 Brookfield DrApr 23, 202635 tunnel to expose all cast iron sewer lines under home and replace with sch 40 pvc piping. tunnel access will be located in front of home. we will be trenching 40 from homeowner clean out to city tap to replace cast iron building sewer line · 125 m away
- 8524 Maine DrJan 23, 2025Service upgrade from 100amps to 200amps overhead riser and through the roof new grounding · 127 m away
- 8519 Maine DrMay 6, 2025Replacement of an existing water heater standard 50 gal natural gas water heater change out · 127 m away
- 8516 New Hampshire DrApr 21, 2026Replacement of an existing water heater change out: install/ replace 40 gallon tank-type natural gas water heater · 134 m away
- 8520 New Hampshire DrNov 21, 202516ft tunnel under foundation of home 40ft of yard line for sewer line replacement · 135 m away
- 8520 Maine DrMar 3, 202520-23 ft of excavation under foundation to repair laundry drain lines · 134 m away
- 8522 New Hampshire DrAug 5, 2025Panel and meter can upgrade 200 amps · 143 m away
- 1201 Buckeye CtNov 27, 2023Tunnel below the foundation to repair drain lines · 144 m away
- 8512 New Hampshire DrNov 5, 2025Install new 7.225 kw rooftop solar system and 13.5 kw energy storage system for existing residential only · 148 m away
- 8512 Maine DrNov 4, 2025Service replacement · 150 m away