1204 Artesian Cir
Austin, TX 78758
1204 Artesian Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 1204 Artesian Cir, Austin, TX 78758. The most recent, filed May 1, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated May 1, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 1, 2024
- since May 1, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-053448 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1204 Artesian Cir
What is being built at 1204 Artesian Cir?
The latest filing (City of Austin permit 2024-053448 MP, May 1, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 1204 Artesian Cir have?
1 filing across 1 project, from May 1, 2024 to May 1, 2024.
Is there other construction near 1204 Artesian Cir?
Yes. Nearby filings include 1202 Artesian Cir (replacement of complete existing central heat and air system with or without duct work, Dec 1, 2023); 1200 Artesian Cir (200amp main breaker panel and service replacement. austin energy is the electrical provider, Sep 1, 2026); 8603 Brookfield Dr (35 tunnel to expose all cast iron sewer lines under home and replace with sch 40 pvc piping. tunnel access will be located in front of home. we will be trenching 40 from homeowner clean out to city tap to replace cast iron building sewer line, Apr 23, 2026).
How do I get alerts for new permits at 1204 Artesian Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 1202 Artesian CirDec 1, 2023Replacement of complete existing central heat and air system with or without duct work · 32 m away
- 1200 Artesian CirSep 1, 2026200amp main breaker panel and service replacement. austin energy is the electrical provider · 46 m away
- 8603 Brookfield DrApr 23, 202635 tunnel to expose all cast iron sewer lines under home and replace with sch 40 pvc piping. tunnel access will be located in front of home. we will be trenching 40 from homeowner clean out to city tap to replace cast iron building sewer line · 94 m away
- 8520 Brookfield DrApr 7, 2025Repair 150 a 120/240 main over head service due to storm · 136 m away
- 8600 Brookfield DrJan 2, 2026Replacement of complete existing central heat and air system with or without duct work miller · 136 m away
- 8609 Brookfield DrSep 15, 2025Request to disconnect installation of 200 amp microgrid interconnection device on service with existing 200 amp meter can to remain · 139 m away
- 8524 Maine DrJan 23, 2025Service upgrade from 100amps to 200amps overhead riser and through the roof new grounding · 142 m away
- 8518 Brookfield DrJul 11, 2025Need to test and possibly repair gas meter is necessary **replacement of an existing water heater at residence · 143 m away
- 8519 Maine DrMay 6, 2025Replacement of an existing water heater standard 50 gal natural gas water heater change out · 146 m away
- 8520 Maine DrMar 3, 202520-23 ft of excavation under foundation to repair laundry drain lines · 148 m away
- 1200 Larkspur RdJul 3, 2024Excavate 50 feet of outside sewer yard line. cut out all exposed plumbing and bed in new sewer line with sand per code. also excavate roughly 20 feet from under the home to replace underslab sewer lines. hang new sewer line using clevis hangers per code · 149 m away
- 8517 Parkfield DrSep 18, 2024Express: siding repair · 152 m away