8519 Maine Dr
Austin, TX 78758
8519 Maine Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 8519 Maine Dr, Austin, TX 78758. The most recent, filed May 6, 2025, covers: “Replacement of an existing water heater standard 50 gal natural gas water heater change out”.
Compiled from City of Austin records · updated May 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 6, 2025
- since May 6, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of an existing water heater standard 50 gal natural gas water heater change out
- AppliedMay 2, 2025
- IssuedMay 6, 2025
- !WorkMay '25 – Nov '25
- Final inspection
Marked expired Nov 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater standard 50 gal natural gas water heater change out
Replacement of an existing water heater standard 50 gal natural gas water heater change out
City of Austin permitPlumbing PermitExpired- Record
- 2025-054504 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8519 Maine Dr
What is being built at 8519 Maine Dr?
The latest filing (City of Austin permit 2025-054504 PP, May 6, 2025) covers replacement of an existing water heater standard 50 gal natural gas water heater change out.
How many permits and filings does 8519 Maine Dr have?
1 filing across 1 project, from May 6, 2025 to May 6, 2025.
Is there other construction near 8519 Maine Dr?
Yes. Nearby filings include 8524 Maine Dr (service upgrade from 100amps to 200amps overhead riser and through the roof new grounding, Jan 23, 2025); 8520 Maine Dr (20-23 ft of excavation under foundation to repair laundry drain lines, Mar 3, 2025); 8512 Maine Dr (service replacement, Nov 4, 2025).
How do I get alerts for new permits at 8519 Maine Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 8524 Maine DrJan 23, 2025Service upgrade from 100amps to 200amps overhead riser and through the roof new grounding · 15 m away
- 8520 Maine DrMar 3, 202520-23 ft of excavation under foundation to repair laundry drain lines · 22 m away
- 8512 Maine DrNov 4, 2025Service replacement · 38 m away
- 8510 New Hampshire DrMar 4, 202525 tunnel below the foundation to replace the utility to kitchen drain line. 1 access hole in back · 56 m away
- 1123 Plymouth DrFeb 14, 2024Replace austin energy meter socket main breaker box and outlets · 62 m away
- 8512 New Hampshire DrNov 5, 2025Install new 7.225 kw rooftop solar system and 13.5 kw energy storage system for existing residential only · 69 m away
- 8508 Maine DrApr 18, 2024Replacement of an existing water heater · 73 m away
- 8516 New Hampshire DrApr 21, 2026Replacement of an existing water heater change out: install/ replace 40 gallon tank-type natural gas water heater · 96 m away
- 1200 Artesian CirSep 1, 2026200amp main breaker panel and service replacement. austin energy is the electrical provider · 102 m away
- 8517 Parkfield DrSep 18, 2024Express: siding repair · 104 m away
- 8515 Parkfield DrNov 27, 2023Express: wood decking board replacement asphalt shingle replacement (exempt) · 106 m away
- 1120 Colony North DrDec 13, 2023Tunnel below the foundation to repair drain lines. trench thru yard to repair yard sewer · 108 m away