12021 Metric Blvd
Austin, TX 78758
12021 Metric Blvd: 3 projects on record
City of Austin lists 3 filings across 3 projects at 12021 Metric Blvd, Austin, TX 78758 since March 2, 2007. The most recent, filed October 2, 2007, covers: “Village at walnut creek, ph. 1-a, sec. 2”.
Compiled from City of Austin records · updated Oct 2, 2007
- Projects
- 3
- 3 filings
- Latest filing
- Oct 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Austin
Questions about 12021 Metric Blvd
What is being built at 12021 Metric Blvd?
The latest filing (City of Austin case 106497, October 2, 2007) covers village at walnut creek, ph. 1-a, sec. 2.
How many permits and filings does 12021 Metric Blvd have?
3 filings across 3 projects, from March 2, 2007 to October 2, 2007.
What is being built near St. Albert The Great Catholic Church Campus - Palermo Building in Austin?
12021 Metric Blvd is about 250 m from St. Albert The Great Catholic Church Campus - Palermo Building (12041 Bittern Hollow). Its latest filing is for village at walnut creek, ph. 1-a, sec. 2.
Is there other construction near 12021 Metric Blvd?
Yes. Nearby filings include 12001 Metric Blvd (replace rotten/damaged wood columns to existing multi-family building -bldgs. 6 & 8, Oct 20, 2025); 12041 Bittern Holw (interior remodel of existing church office, Mar 19, 2025); 11940 Rosethorn Dr (200amp panel and meter replacement also adding grounding and surge protections meter work being done electric provider: austin electric, May 29, 2026).
How do I get alerts for new permits at 12021 Metric Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 12001 Metric BlvdOct 20, 2025Replace rotten/damaged wood columns to existing multi-family building -bldgs. 6 & 8 · 107 m away
- 12041 Bittern HolwMar 19, 2025Interior remodel of existing church office · 112 m away
- 11940 Rosethorn DrMay 29, 2026200amp panel and meter replacement also adding grounding and surge protections meter work being done electric provider: austin electric · 198 m away
- 12002 Rosethorn DrAug 1, 2024200-amp service rebuild · 207 m away
- 12041 Bittern Hollow · St. Albert The Great Catholic Church Campus - Palermo BuildingDec 5, 2024St. albert the great catholic church - palermo center office renovation — renovation/alteration — renovate existing offices - approximately 1,500 sq ft · 250 m away
- 12003 Rosethorn DrJan 19, 2024Replacement of complete existing central heat and air system with or without duct work · 256 m away
- 11921 Snow Finch RdAug 12, 2025Replacement of an existing water heater 40gal gas wh · 284 m away
- 11942 Sunhillow BndJun 24, 2026Replacement of an existing water heater remove and replace water heater - 40 gal gas · 285 m away
- 11948 Sunhillow BndJul 23, 2025Replacement of an existing water heater lot 3 blk b village at walnut creek phs 1 · 289 m away
- 11919 Snow Finch RdJul 17, 2024Replacement of complete existing central heat and air system with or without duct work · 300 m away
- 12004 Snow Goose RdSep 9, 2025Express: replacing 3 windows and 1 door (like for like) · 301 m away
- 11923 Rosethorn DrJan 17, 2025Replacement of complete existing central heat and air system with or without duct work · 306 m away