1410 Lance Way
Austin, TX 78758
Electrical panel upgrade and car charger at 1410 Lance Way
A City of Austin electrical permit filed March 3, 2026, indicates work to upgrade the electrical panel and add a car charger at 1410 Lance Way. Permit 2026-024715 EP is listed as final.
Summarized from City of Austin records · updated Mar 3, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 3, 2026
- since Mar 3, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrade panel and add car charger
- AppliedMar 2, 2026
- IssuedMar 3, 2026
- WorkMar '26 – May '26
- Final inspectionMay 29, 2026
Passed final inspection May 29, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectUpgrade panel and add car charger
Upgrade panel and add car charger
City of Austin permitElectrical PermitFinal- Record
- 2026-024715 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1410 Lance Way
What is being built at 1410 Lance Way?
A City of Austin electrical permit indicates an electrical panel upgrade and the addition of a car charger. The permit is listed as final.
Is a new building planned at 1410 Lance Way?
The available permit record describes electrical work: upgrading the panel and adding a car charger. It does not describe a new building.
When was the permit filed for 1410 Lance Way?
The City of Austin permit was filed March 3, 2026.
What is permit 2026-024715 EP for?
Permit 2026-024715 EP covers an electrical panel upgrade and the addition of a car charger at 1410 Lance Way.
Is the 1410 Lance Way electrical permit final?
Yes. City of Austin records list permit 2026-024715 EP as final.
Also being built nearby
All of 78758- 1414 Lance WayMar 10, 2025Upgrade underground main service to 200 amps. new panel meter can standard breakers · 45 m away
- 1411 Lance WayNov 21, 2023Replacement of complete existing central heat and air system with or without duct work · 47 m away
- 11828 Carshalton DrSep 10, 2025Replacement of complete existing central heat and air system with or without duct work tammy munoz - replacing like for like 3.5t vert gas system · 57 m away
- 1407 Lance WayAug 27, 2024Replacement of complete existing central heat and air system with or without duct work · 72 m away
- 11818 Carshalton DrJul 30, 2026Replacement of an existing water heater replace 50 gallon natural gas water heater · 84 m away
- 1402 Lance WayJul 3, 2024Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 1408 Gorham StJul 6, 2026Express: foundation repair · 107 m away
- 1409 Doonesbury DrJul 30, 2025Replacement of an existing water heater 40gal gas · 109 m away
- 1403 Lance WayApr 12, 2025Replacement of an existing water heater · 111 m away
- 1428 Gorham StJul 14, 2025We will excavate approximately 50 feet of trench from the water meter to the newly installed exterior piping. this work will include: minor tunneling beneath the sidewalk minor tunneling under a concrete wall installation of new water service line buried at a minimum depth of 12 inches warranty: all materials and labor are covered under a 25-year warranty · 123 m away
- 11814 Carshalton DrJan 15, 2026Service upgrade · 125 m away
- 1421 Gorham StAug 3, 2024Replacement of complete existing central heat and air system with or without duct work · 128 m away