1413 Fairfield Dr
Austin, TX 78758
Permits cover HVAC replacement and EV charging equipment
City of Austin permits at 1413 Fairfield Dr cover replacement of the home's central heating and air system and installation of EV charging equipment. The EVSE permit was filed April 29, 2024, and the mechanical permit for the HVAC replacement was filed August 26, 2026; both are marked final.
Summarized from City of Austin records · updated Aug 26, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 26, 2026
- since Apr 29, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedAug 24, 2026
- IssuedAug 26, 2026
- WorkAug '26 – Sep '26
- Final inspectionSep 2, 2026
Passed final inspection Sep 2, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-110666 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install evse
Install evse
City of Austin permitElectrical PermitFinal- Record
- 2024-051127 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1413 Fairfield Dr
What is being built at 1413 Fairfield Dr?
City permits cover installation of EV charging equipment and replacement of the home's central heat and air system. The records do not indicate a new building.
Is a new house being built at 1413 Fairfield Dr?
The permits listed for the address are for residential mechanical and electrical work, not new-home construction.
What HVAC work is permitted at 1413 Fairfield Dr?
A City of Austin mechanical permit covers replacement of the complete existing central heat and air system, with or without duct work. Permit 2026-110666 MP was filed August 26, 2026, and is marked final.
Is there an EV charger permit for 1413 Fairfield Dr?
Yes. City of Austin electrical permit 2024-051127 EP lists EVSE installation and was filed April 29, 2024. It is marked final.
When were permits filed for 1413 Fairfield Dr?
The EVSE electrical permit was filed April 29, 2024. The HVAC replacement permit was filed August 26, 2026.
Also being built nearby
All of 78758- 8611 Clarewood DrNov 14, 2025Install new 4.350 kw rooftop solar system for existing residential only · 45 m away
- 1405 Fairfield DrApr 12, 2024Home builders loop ref: 2024-011802 ep · 85 m away
- 8602 Clarewood CirNov 21, 2024Change out water heater to existiing residence · 94 m away
- 8600 Clarewood CirDec 6, 2024Excavate a 30 tunnel and repair the kitchen main line · 105 m away
- 1402 Fairfield DrAug 14, 2026Approx. 70 ft long tunnel work for: two bathrooms kitchen & washer. sewer line would be approx. 30 ft from the city cleanout to the house · 111 m away
- 8600 Brookfield DrJan 2, 2026Replacement of complete existing central heat and air system with or without duct work miller · 135 m away
- 8507 Remington LnAug 18, 2025Replacement of complete existing central heat and air system with or without duct work located in closet · 143 m away
- 8505 Remington LnMar 11, 202585 tunnel below the foundation to replace entire cast-iron drain system. 3 access holes - front right left and trench thru yard to replace the yard sewer line · 148 m away
- 8520 Brookfield DrApr 7, 2025Repair 150 a 120/240 main over head service due to storm · 160 m away
- 8609 Brookfield DrSep 15, 2025Request to disconnect installation of 200 amp microgrid interconnection device on service with existing 200 amp meter can to remain · 170 m away
- 8518 Brookfield DrJul 11, 2025Need to test and possibly repair gas meter is necessary **replacement of an existing water heater at residence · 172 m away
- 8603 Brookfield DrApr 23, 202635 tunnel to expose all cast iron sewer lines under home and replace with sch 40 pvc piping. tunnel access will be located in front of home. we will be trenching 40 from homeowner clean out to city tap to replace cast iron building sewer line · 174 m away