2011 W Rundberg Lane
Austin, TX 78758 · Aisd Padron Elementary School Renovations, Secure Vestibule At Padron Elementary School
Padron Elementary classroom and facility renovations
Renovations at Padron Elementary School at 2011 W. Rundberg Lane were registered with the Texas Department of Licensing and Regulation on February 5, 2026. The 2,340-square-foot project includes classroom updates, a community room, a mental health center with an office, and cafeteria and second-floor work.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 5, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Feb 5, 2026
- since Jan 9, 2024
- Largest scope
- 2,340 sf
- Estimated cost
- $550K
- state registration
Where this project stands
Under constructionAISD PADRON ELEMENTARY SCHOOL RENOVATIONS
2,340 sq ft · $550K est.
- RegisteredFeb 5, 2026
- Plan review
- ConstructionJun '26 – Jul '27
- Inspected
- Closed
4 contacts on this project · 2 phone numbers
Permit & project history
2 projectsReno of existing classrooms. wet areas, renovating existing classrooms into a community room, mental health center w office, existing wet areas, adding powered roller shade as phase 1a to existing cafeteria, dividing partition and door to 2nd floor — padron elementary school
TDLR project registrationRenovation/AlterationReview Complete2,340 sq ft$550K est.- Project #
- TABS2026011819
- Tenant / owner
- Aisd Padron Elementary School Renovations
- Design firm
- Pro
- Contact
- Pro
Addition of new secure vestibule at main entrance of school. — padron elementary school
TDLR project registrationRenovation/AlterationProject Closed2,102 sq ft$79K est.- Project #
- TABS2024008808
- Tenant / owner
- Secure Vestibule At Padron Elementary School
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2011 W Rundberg Lane
What is being renovated at 2011 W. Rundberg Lane?
The project is renovations at Padron Elementary School, including existing classrooms, wet areas, a community room, and a mental health center with an office. The TDLR registration is TABS2026011819.
When was the Padron Elementary renovation registered?
The project was registered with the Texas Department of Licensing and Regulation on February 5, 2026. Its status is listed as Review Complete.
What work is planned for Padron Elementary School?
The registration describes renovating existing classrooms and wet areas, converting classrooms into a community room and mental health center with an office, and adding a powered roller shade in the cafeteria. It also lists a dividing partition and door on the second floor.
How large is the Padron Elementary renovation?
The TDLR registration lists the project at 2,340 square feet.
What is the estimated cost of the Padron Elementary renovations?
The applicant's estimated cost for the project is $549,752, according to its TDLR registration.
Is a new school being built at 2011 W. Rundberg Lane?
The record describes a renovation and alteration project at the existing Padron Elementary School, not construction of a new school.
Also being built nearby
All of 78758- 1907 West LoopFeb 23, 2026Tunneling approx. 60ft under home redoing main sewer line · 98 m away
- 1930 W Rundberg LnJul 16, 2026***timed virtual inspection: 08/17/2026 @ 11 am*** replacement of complete existing central heat and air system with or without duct work · 99 m away
- 1902 West LoopOct 14, 2026Repair conductors that bypassed meter · 102 m away
- 1906 West LoopSep 29, 2026Replacing subpanel due to fire damage by vandalism · 102 m away
- 9120 Northgate BlvdJul 24, 2026Emergency repair-the wires burnt out we have to replace the wire · 107 m away
- 9300 Northgate BlvdOct 9, 2026Emergency permit: replace burnt wire from tap box to gutter · 108 m away
- 1904 West LoopJun 24, 2024Replacement of an existing water heater · 135 m away
- 9209 Northgate BlvdOct 28, 2010Northgate terrace section 1 · 159 m away
- 1830 W Rundberg LnFeb 13, 2024Fire damage repair for units 127 128 227 and 228 · 192 m away
- 9329 Northgate BlvdApr 9, 2026Replacement of condenser only condenser only building c unit number c202 · 239 m away
- 9024 Northgate BlvdJun 16, 2025Replacement of complete existing central heat and air system with or without duct work · 239 m away
- 2018 W Rundberg LnMar 31, 2026Called out to customer spoke with diane. building 11 unit c replacement of complete existing central heat and air system with or without duct work install replacement of 1.5 ton ac system and rebuilding the supply plenum · 253 m away