groundranger
Active · latest filing Oct 2026Commercial

2036 Centimeter Cir

Austin, TX 78758

Roof replacement and gas service work at 2036 Centimeter Cir

Permits indicate roof replacement and gas service work at 2036 Centimeter Cir in Austin. A plumbing permit filed April 10, 2026, concerns gas service and a required pressure test; a building permit filed October 21, 2026, covers removing the existing roofing assembly and installing new insulation and cover board.

Summarized from City of Austin records · updated Oct 21, 2026

Projects
2
2 filings
Latest filing
Oct 21, 2026
since Apr 10, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Removing the existing roofing assembly down to the substrate repairing any damaged structural decking and installing new code-compliant rigid insulation and cover board

  1. AppliedSep 17, 2026
  2. IssuedOct 21, 2026
  3. WorkOct '26 – Apr '27
  4. Final inspection
16% through of the permit windowOct 21, 2026 → Apr 20, 2027

2 contacts on this project · 2 phone numbers

Permit & project history

2 projects
  1. Removing the existing roofing assembly down to the substrate repairing any damaged structural decking and installing new code-compliant rigid insulation and cover board

    Removing the existing roofing assembly down to the substrate repairing any damaged structural decking and installing new code-compliant rigid insulation and cover board

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Metter has been pulled from gas services gas pressure test is needed so we can provied gas to building

    Metter has been pulled from gas services gas pressure test is needed so we can provied gas to building

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2036 Centimeter Cir

What is being built at 2036 Centimeter Cir?

The permits describe building maintenance rather than a new building: roof replacement work and a gas service pressure test. The building permit is 2026-123256 BP, filed October 21, 2026.

What roof work is permitted at 2036 Centimeter Cir?

Permit 2026-123256 BP covers removing the existing roofing assembly to the substrate, repairing any damaged structural decking, and installing new code-compliant rigid insulation and cover board. It was filed October 21, 2026.

Is gas service work planned at 2036 Centimeter Cir?

A plumbing permit filed April 10, 2026, says the meter had been pulled from gas services and a gas pressure test was needed to provide gas to the building. The permit number is 2026-043091 PP.

What work is happening near Warehouse Subdivide at 2020 Rutland Dr?

At nearby 2036 Centimeter Cir, Austin permits indicate roof replacement and gas service work. The address is listed 156 meters from Warehouse Subdivide at 2020 Rutland Dr.

What work is happening near Subzero Tlk-Ferguson on Rutland Drive?

Permits for 2036 Centimeter Cir describe roof replacement and gas service work. The address is listed 220 meters from Subzero Tlk-Ferguson at 2209 B Rutland Drive.

Also being built nearby

All of 78758
Email me when it passes final inspection