2601 Esperanza Xing
Austin, TX 78758
EV charging station planned for existing apartment building
Permits indicate a dual EV charging station will be installed at building 6 of the existing multifamily property at 2601 Esperanza Xing. The building permit was filed September 22, 2026, and the electrical permit followed on September 29, 2026.
Summarized from City of Austin records · updated Sep 29, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 29, 2026
- since Sep 22, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstallation of ev dual charging station pedestal mounted at building #6. existing multifamily building. 2026-082927 da
- AppliedAug 21, 2026
- IssuedSep 29, 2026
- WorkSep '26 – Nov '26
- Final inspectionNov 10, 2026
Passed final inspection Nov 10, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstallation of ev dual charging station pedestal mounted at building #6. existing multifamily building. 2026-082927 da
Installation of ev dual charging station pedestal mounted at building #6. existing multifamily building. 2026-082927 da
City of Austin permitElectrical PermitFinal- Record
- 2026-123257 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of ev dual charging station pedestal mounted at building #6. existing multifamily building. 2026-082927 da
Installation of ev dual charging station pedestal mounted at building #6. existing multifamily building. 2026-082927 da
City of Austin permitBuilding PermitFinal- Record
- 2026-123257 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2601 Esperanza Xing
What is being installed at 2601 Esperanza Xing?
Permits indicate a pedestal-mounted dual EV charging station is planned for building 6 of the existing multifamily property.
Is a new apartment building being built at 2601 Esperanza Xing?
The permit descriptions refer to an existing multifamily building and an EV charging station installation, not construction of a new apartment building.
When were permits filed for the EV charger at 2601 Esperanza Xing?
The building permit, 2026-123257 BP, was filed September 22, 2026. The electrical permit, 2026-123257 EP, was filed September 29, 2026.
Where will the EV charging station be installed?
The permit description places the pedestal-mounted dual charging station at building 6 of the existing multifamily property at 2601 Esperanza Xing.
Is the EV charging station project permitted?
The City of Austin building and electrical permits are both listed with final status. They were filed September 22 and September 29, 2026, respectively.
Also being built nearby
All of 78758- 11301 Burnet RdOct 19, 2016Dos salsas - the domain · 159 m away
- 2700 Esperanza XingJul 27, 2026Replace non lead free rpz on second floor for ice maker in server area · 166 m away
- 11303-1/2 Burnet RdFeb 6, 2013Esperanza way extension road, drainage and utility plan · 188 m away
- 11515 Burnet Rd · One Uptown Office Property LPNov 10, 2026Interior renovation for bus/admin/prof office and interior renovation to create 11th floor corridor. (2 apps) · 204 m away
- 2800 Esperanza XingMay 10, 2016Homes 2 suites by hilton · 210 m away
- 11515 Burnet Road 11515 Burnet Road · One Uptown Office PropertyMay 26, 2026Industrious — renovation/alteration — interior fit-up of a shell space for a new tenant · 220 m away
- 11515 Burnet Road · State Of TexasNov 11, 2026Dps hq building c roof replacement — renovation/alteration — remove and replace existing roof systems. includes adjusting the mechanical and electrical equipment on the roof and providing new roof curbs for the mechanical equipment · 220 m away
- 11501 Burnet Road · Building 902May 13, 2026Uptown atx - building 902 — renovation/alteration — this is a re-skin and interior renovation of an existing 6-story office building. scope is to include new facade/building envelope, renovated lobby and new amenities, and renovated restrooms · 222 m away
- 2618 Kramer LnDec 13, 2023Run new gas line for fire pit · 236 m away
- 11101 Burnet RdSep 29, 2026Repair gas leak on kitchen gas bank re-pipe gas outlets with individual isolation shut off valves per appliance · 245 m away
- 2900 Esperanza Crossing · 2900 Esperanza Crossing LPNov 20, 2025Aus 27 — renovation/alteration — interior renovations for floors 2, 3, and 5 approximately 96,000 sq ft including meeting rooms and office space · 247 m away
- 2526-1/2 Kramer LnMar 2, 2007Biscay (telecommunications tower) · 270 m away