3311 Esperanza Crossing
Austin, TX 78758
Starbucks cafe planned inside Macy’s at The Domain
A 1,485-square-foot Starbucks cafe is planned inside the existing Macy’s at 3311 Esperanza Crossing. The project was registered with TDLR on December 19, 2024, as a renovation and alteration; the applicant estimated the project cost at $1 million. The work description includes interior demolition, new walls, casework, finishes, equipment and lighting.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 19, 2024
- since Dec 19, 2024
- Largest scope
- 1,485 sf
- Estimated cost
- $1.0M
- state registration
Where this project stands
Finishing up · inspection nextMacy's The Domain
1,485 sq ft · $1.0M est.
- RegisteredDec 19, 2024
- Plan review
- ConstructionMar '25 – May '25
- Inspectednow
- Closed
Scheduled to finish May 9, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectNew construction of a starbucks cafe in an existing macy's department store. work includes demolition, new wall construction, casework, furniture, interior finishes, equipment and lighting. — macy's
TDLR project registrationRenovation/AlterationReview Complete1,485 sq ft$1.0M est.- Project #
- TABS2025008168
- Tenant / owner
- Macy's The Domain
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3311 Esperanza Crossing
What is being built at 3311 Esperanza Crossing?
A Starbucks cafe is planned inside the existing Macy’s department store. The TDLR registration describes a 1,485-square-foot renovation and alteration.
When was the Starbucks cafe project registered?
The project was registered with TDLR on December 19, 2024. Its registration number is TABS2025008168.
Is a Starbucks opening inside Macy’s at The Domain?
The project description says a Starbucks cafe will be built inside the existing Macy’s. The records provided do not give an opening date.
What work is planned inside Macy’s at 3311 Esperanza Crossing?
The description lists demolition, new wall construction, casework, furniture, interior finishes, equipment and lighting. A later filing dated August 28, 2025, also describes an interior remodel to install the cafe and a new grease trap.
What is the estimated cost of the Starbucks cafe project at The Domain?
The TDLR registration lists an applicant-estimated cost of $1 million for the project.
Is the cafe near Domain Mall?
The Macy’s address is 13 meters from records labeled Domain Mall at 3309 Esperanza Crossing.
Also being built nearby
All of 78758- 3309 Esperanza Xing · Domain Mall II LLC TheAug 17, 2026Change of use office to restaurant. adding gi with remodel to existing tenant space · 13 m away
- 3309 Esperanza Crossing · Domain Mall, LLCFeb 14, 2024Hawkers - domain — renovation/alteration — tenant build out of an existing 7,281sf space/ proposed 2nd floor with bar and seating · 13 m away
- 11401 Century Oaks Terrace · The Domain Mall II LLCJul 1, 2026Offices at the domain - suite 430/420 — renovation/alteration — renovation of an existing suite to be split into two separate suites · 18 m away
- 11410 Century Oaks Terrace Space A05 · Domain Mall II LLC TheMar 27, 2025Golden goose - the domain — renovation/alteration — interior tenant remodel. no change in use · 26 m away
- 11410 Century Oaks Terrace Space · The Domain Mall Ii, LLCMay 22, 2026Aritzia, the domain expansion — renovation/alteration — 1,155 sq ft retail tenant expansion of 7,013 sq ft existing retail space · 26 m away
- 11410 Century Oaks Terrace · The Domain Mall II LLCJun 18, 2026Johnnie-o — renovation/alteration — interior retail space construction sq ft 2100 · 26 m away
- 3401 Esperanza XingNov 6, 20261/2 rpz for soda rack replacement · 37 m away
- 3311 Esperanza XingAug 28, 2025Interior remodel to install starbucks cafe in existing macys dept store; interior demolition new wall casework furniture interior finishes lighting and new grease trap 2024 166227 da - concurrent reviews · 50 m away
- 11401 Century Oaks TerOct 5, 2026Interior remodel of existing office space. (2 apps - suite 420 and 430) · 82 m away
- 3306 Esperanza XingMay 14, 2024Cou and interior remodel to create retail space for furniture show room & design center · 86 m away
- 3306 Esperanza Crossing · Simon Property GroupJan 29, 2024Ikea - austin the domain — renovation/alteration — tenant finish out of an existing lease space · 90 m away
- 3409 Esperanza XingJul 15, 2025Eplan: commercial expedited review - [concurrent] interior remodel of an exciting zara store 11796 sq ft and interior expansion to take over the forever 21 retail space 23251 sq ft suite #110 at the domain center to become a total of 35047 sq ft · 102 m away
More demolitions in 78758, restaurants in 78758, retail spaces in 78758.