8506 Remington Ln
Austin, TX 78758
Drain-system replacement permitted at 8506 Remington Ln
A City of Austin plumbing permit filed June 18, 2026, covers replacing the entire drain system at 8506 Remington Ln. The permit describes an 85-foot tunnel beneath the foundation and four access holes; its status is active.
Summarized from City of Austin records · updated Jun 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 18, 2026
- since Jun 18, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underway85 tunnel below the foundation to replace entire drain system. 4 access holes - front back left left
- AppliedApr 20, 2026
- IssuedJun 18, 2026
- WorkJun '26 – Dec '26
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 project85 tunnel below the foundation to replace entire drain system. 4 access holes - front back left left
85 tunnel below the foundation to replace entire drain system. 4 access holes - front back left left
City of Austin permitPlumbing PermitActive- Record
- 2026-048383 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8506 Remington Ln
What is being built at 8506 Remington Ln?
The permit record describes drain-system replacement, not a new building. It covers an 85-foot tunnel beneath the foundation and four access holes.
What work is planned at 8506 Remington Ln in Austin?
A plumbing permit covers replacing the entire drain system. The City of Austin filed permit 2026-048383 PP on June 18, 2026.
When was the plumbing permit for 8506 Remington Ln filed?
The City of Austin filed permit 2026-048383 PP on June 18, 2026. The permit status is listed as active.
Is a new home being built at 8506 Remington Ln?
The available permit record is for plumbing work to replace the drain system. It does not describe construction of a new home.
What's happening near Town North Holdings on Research Boulevard?
At 8506 Remington Ln, near Town North Holdings at 8557 Research Blvd, a City of Austin plumbing permit covers drain-system replacement. It was filed June 18, 2026.
Also being built nearby
All of 78758- 8507 Remington LnAug 18, 2025Replacement of complete existing central heat and air system with or without duct work located in closet · 41 m away
- 8510 Remington LnSep 20, 2024New 2-story adu 2 bed/2 bath · 46 m away
- 8505 Remington LnMar 11, 202585 tunnel below the foundation to replace entire cast-iron drain system. 3 access holes - front right left and trench thru yard to replace the yard sewer line · 48 m away
- 8502 Dryfield DrAug 20, 2026Replace sewer line from building to city connection · 69 m away
- 8600 Clarewood CirDec 6, 2024Excavate a 30 tunnel and repair the kitchen main line · 83 m away
- 1433 Fairfield DrJun 12, 2024Repair and upgrade electrical service · 84 m away
- 8602 Clarewood CirNov 21, 2024Change out water heater to existiing residence · 88 m away
- 8523 Research Blvd Svrd NbDec 29, 2023Replace sewer yard line · 101 m away
- 8557 Research Blvd Svrd NbAug 21, 2026Change of use from auto parts shop to tea house 2026 001936 da - approved · 127 m away
- 8557 Research Blvd SvrdMar 18, 20268557 research land use · 127 m away
- 8415 Research Blvd Svrd NbSep 9, 2025Need to replace two 1/2 watts lf009qt rp assemblies and one 1/2 watts lf007 dc assembly for soda and ice machine · 172 m away
- 8557-1/2 Research Blvd SvrdMar 2, 2007Au 12988 lanier/town north · 178 m away