900 Conrad St
Austin, TX 78758
Home HVAC and sewer repairs permitted at 900 Conrad St
City of Austin permits cover a like-for-like replacement of the home's central heat and air system and a sewer line repair beneath its foundation. The sewer repair permit was filed April 24, 2025, and the mechanical permit for the HVAC replacement was filed October 28, 2025; both are marked final.
Summarized from City of Austin records · updated Oct 28, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 28, 2025
- since Apr 24, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work vickie simpson - replacing like for like 3t vert gas system
- AppliedOct 27, 2025
- IssuedOct 28, 2025
- WorkOct '25 – Oct '25
- Final inspectionOct 30, 2025
Passed final inspection Oct 30, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work vickie simpson - replacing like for like 3t vert gas system
Replacement of complete existing central heat and air system with or without duct work vickie simpson - replacing like for like 3t vert gas system
City of Austin permitMechanical PermitFinal- Record
- 2025-138488 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Tunnel/sewer line repair under the foundation of the home roughly 30ft. no sheetrock removal. the access hole is by the sewer line cleanout near the foundation of the home. the work is being done by the washer drain and underneath the foundation of the home - to the city sewer tap in the front yard replacing damaged pipe with pvc
Tunnel/sewer line repair under the foundation of the home roughly 30ft. no sheetrock removal. the access hole is by the sewer line cleanout near the foundation of the home. the work is being done by the washer drain and underneath the foundation of the home - to the city sewer tap in the front yard replacing damaged pipe with pvc
City of Austin permitPlumbing PermitFinal- Record
- 2025-044998 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 900 Conrad St
What is being built at 900 Conrad St in Austin?
The permits record home repairs, not a new building: a sewer line repair beneath the foundation and replacement of the existing central heat and air system.
Is a new home being built at 900 Conrad St?
The available City of Austin permits describe repairs to an existing home. They do not indicate construction of a new home.
What work does the HVAC permit at 900 Conrad St cover?
Mechanical permit 2025-138488 MP, filed October 28, 2025, covers replacement of the complete existing central heat and air system with a like-for-like 3-ton gas system.
What does the sewer permit at 900 Conrad St cover?
Plumbing permit 2025-044998 PP, filed April 24, 2025, covers roughly 30 feet of sewer line repair beneath the home's foundation, replacing damaged pipe with PVC.
Are the permits for 900 Conrad St final?
Yes. Both listed City of Austin permits are marked final: plumbing permit 2025-044998 PP and mechanical permit 2025-138488 MP.
Also being built nearby
All of 78758- 904 Conrad StNov 2, 2025Replacement of complete existing central heat and air system with or without duct work · 41 m away
- 901 Conrad StSep 22, 2026Base: installing a backup battery system and additional meter socket · 50 m away
- 908 Conrad StMar 19, 2026200amp service upgrade · 91 m away
- 9011 Quail Creek DrOct 7, 2025Repair to sewer line under the house via tunnel · 94 m away
- 8911 Little Walnut PkwyJun 16, 2026Rebuild main service. overhead 200 amp main breaker panel meter can grounding bonding surge protection scheduled shutdown required · 97 m away
- 910 Conrad StMay 24, 2024Emergency service upgrade replacing meter can meter panel and wiring. ae cut off power due to wire damages**customer without power · 104 m away
- 9009 Quail Creek DrApr 23, 2025Upgrade a 100a service to a 200a service · 106 m away
- 9104 Quail Creek DrMay 28, 2026Sewer yard line replacement they have having problems with the drainage lately using ours services to unclog the sewer yard line. its s duplex with one sewer yard line · 115 m away
- 906 Kirschner PlJan 3, 2024Replacement of complete existing central heat and air system with or without duct work · 118 m away
- 1000 Little Elm ParkMar 4, 2025Total demolition of pool 600 sq ft · 137 m away
- 903 Kirschner PlApr 17, 2025Express: replace 1 window like for like · 141 m away
- 9001 Quail Creek DrMar 12, 2026Replacement of complete existing central heat and air system with or without duct work 4-ton condenser change-out in backyard & 88k btu furnace change-out in attic · 145 m away