9009 Laurel Grove Dr
Austin, TX 78758
9009 Laurel Grove Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 9009 Laurel Grove Dr, Austin, TX 78758 since December 15, 2023. The most recent, filed December 12, 2024, covers: “100 tunnel - 45 yard line replacement to replace old cast iron and broken abs”.
Compiled from City of Austin records · updated Dec 12, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Dec 12, 2024
- since Dec 15, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled100 tunnel - 45 yard line replacement to replace old cast iron and broken abs
- AppliedDec 4, 2024
- IssuedDec 12, 2024
- WorkDec '24 – Jan '25
- Final inspectionJan 24, 2025
Passed final inspection Jan 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projects100 tunnel - 45 yard line replacement to replace old cast iron and broken abs
100 tunnel - 45 yard line replacement to replace old cast iron and broken abs
City of Austin permitPlumbing PermitFinal- Record
- 2024-158776 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-158888 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9009 Laurel Grove Dr
What is being built at 9009 Laurel Grove Dr?
The latest filing (City of Austin permit 2024-158776 PP, December 12, 2024) covers 100 tunnel - 45 yard line replacement to replace old cast iron and broken abs.
How many permits and filings does 9009 Laurel Grove Dr have?
2 filings across 2 projects, from December 15, 2023 to December 12, 2024.
Is there other construction near 9009 Laurel Grove Dr?
Yes. Nearby filings include 9008 Collinfield Dr (replacement of complete existing central heat and air system with or without duct work, Nov 2, 2026); 9005 Laurel Grove Dr (replacing 125amp panel like for like, Jul 10, 2024); 9006 Collinfield Dr (replacement of complete existing central heat and air system with or without duct work, Aug 20, 2024).
How do I get alerts for new permits at 9009 Laurel Grove Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 9008 Collinfield DrNov 2, 2026Replacement of complete existing central heat and air system with or without duct work · 42 m away
- 9005 Laurel Grove DrJul 10, 2024Replacing 125amp panel like for like · 48 m away
- 9006 Collinfield DrAug 20, 2024Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 9012 Collinfield DrDec 2, 2025Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be (2-3) access holes on the front right and left sides of the house · 61 m away
- 9014 Laurel Grove DrMar 10, 2025Home: change of use remodel of existing accessory structure to detached dwelling unit · 70 m away
- 9004 Collinfield DrDec 30, 2025Replacement of complete existing central heat and air system with or without duct work · 76 m away
- 9007 Collinfield DrMay 13, 2025Repair to sewer line under house approximately 30ft in · 92 m away
- 9017 Laurel Grove DrApr 21, 2025Replacement of complete existing central heat and air system with or without duct work hallway mechanical closet · 93 m away
- 9007 Viking DrApr 29, 2024Repair leak on gas line · 96 m away
- 9010 Viking DrDec 12, 2025150-amp overhead service rebuild · 130 m away
- 9006 Blue Quail DrAug 10, 2026Replacement of complete existing central heat and air system with or without duct work · 132 m away
- 9012 Viking DrJul 17, 2025To tunnel under the foundation to replace the cast-iron drain lines at the kitchen the laundry and the bathroom and install pvc · 132 m away