905 Neans Dr
Austin, TX 78758
Water service and interior plumbing work at 905 Neans Dr
A City of Austin plumbing permit indicates new water service in the yard and replacement of the home's interior water lines at 905 Neans Dr. The permit was filed June 8, 2026, under permit 2026-069318 PP. The work description notes about 50 feet of new waterline, 120 feet of interior piping, no tunneling, and about 10 square feet of drywall removal for access.
Summarized from City of Austin records · updated Jun 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 8, 2026
- since Jun 8, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new water service in yard. (50 ft of waterline). replace all interior water lines ( approximately 120 ft of pipe). no tunneling. roughly 10 square feet of drywall removed for access
- AppliedJun 1, 2026
- IssuedJun 8, 2026
- WorkJun '26 – Jun '26
- Final inspectionJun 12, 2026
Passed final inspection Jun 12, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall new water service in yard. (50 ft of waterline). replace all interior water lines ( approximately 120 ft of pipe). no tunneling. roughly 10 square feet of drywall removed for access
Install new water service in yard. (50 ft of waterline). replace all interior water lines ( approximately 120 ft of pipe). no tunneling. roughly 10 square feet of drywall removed for access
City of Austin permitPlumbing PermitFinal- Record
- 2026-069318 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 905 Neans Dr
What work is permitted at 905 Neans Dr?
A City of Austin plumbing permit covers new water service in the yard and replacement of interior water lines. The permit was filed June 8, 2026.
Is new construction planned at 905 Neans Dr, Austin?
The record is for plumbing work, not a new building. It describes new yard water service and replacement of interior water lines.
When was the plumbing permit for 905 Neans Dr filed?
The permit was filed June 8, 2026. Its number is 2026-069318 PP.
How much waterline work is planned at 905 Neans Dr?
The permit description specifies about 50 feet of new waterline in the yard and replacement of approximately 120 feet of interior pipe.
Will the waterline work at 905 Neans Dr involve tunneling?
No. The permit description says there will be no tunneling and notes about 10 square feet of drywall removal for access.
Also being built nearby
All of 78758- 907 Neans DrAug 20, 2025This is an emergency permit to repair electrical service that has been disconnected by austin energy due to meter can riser and weatherhead breaking away from building · 25 m away
- 906 Neans DrAug 10, 2026Building 2 new 2 story sfr rear of main house with attached garage and covered patio and balcony 3/2.5 · 54 m away
- 908 Red Cliff DrOct 20, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 77 m away
- 900 Neans DrMar 20, 2026Whole house gas repipe · 81 m away
- 904 Red Cliff DrAug 23, 2024Replace 40gal water heater with tankless water heater install new gas line · 84 m away
- 902 Red Cliff DrOct 2, 2025Replacement of an existing water heater 40gal gas · 92 m away
- 912 Red Cliff DrNov 20, 2025Addition/remodel to single-story sfr- addition of 385 sq ft space to enlarge kitchen and living room. ceiling will be vaulted · 100 m away
- 900 Red Cliff DrAug 23, 2024Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 914 Red Cliff DrDec 2, 2025Replacement of complete existing central heat and air system with or without duct work · 116 m away
- 915 Sagebrush DrOct 27, 2026Replace burned meter can combine two meters to one riser · 118 m away
- 10311 Ray AveMar 2, 2022Flores-gonzalez subdivision · 119 m away
- 909 Red Cliff DrSep 30, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2t vert gas · 122 m away