915 Red Cliff Dr
Austin, TX 78758
915 Red Cliff Dr: 3 projects on record
City of Austin lists 3 filings across 3 projects at 915 Red Cliff Dr, Austin, TX 78758 since November 22, 2023. The most recent, filed August 28, 2024, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Aug 28, 2024
- Projects
- 3
- 3 filings
- Latest filing
- Aug 28, 2024
- since Nov 22, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedAug 13, 2024
- IssuedAug 28, 2024
- WorkAug '24 – Sep '24
- Final inspectionSep 4, 2024
Passed final inspection Sep 4, 2024.
1 contact on this project · 1 phone number
Permit & project history
3 projectsReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-102494 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Update and upgrade an existing service to 200 amps meter can and 200 amp electrical panel
Update and upgrade an existing service to 200 amps meter can and 200 amp electrical panel
City of Austin permitElectrical PermitExpired- Record
- 2024-073105 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Schedule disconnect so we can replace panel like for like replacing 125amp zinsco panelo with new 125 amp main breaker panel. changing out old aluminum feeders with ne3w 1/0 copper wire3
Schedule disconnect so we can replace panel like for like replacing 125amp zinsco panelo with new 125 amp main breaker panel. changing out old aluminum feeders with ne3w 1/0 copper wire3
City of Austin permitElectrical PermitExpired- Record
- 2023-146347 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 915 Red Cliff Dr
What is being built at 915 Red Cliff Dr?
The latest filing (City of Austin permit 2024-102494 PP, August 28, 2024) covers replacement of an existing water heater.
How many permits and filings does 915 Red Cliff Dr have?
3 filings across 3 projects, from November 22, 2023 to August 28, 2024.
Is there other construction near 915 Red Cliff Dr?
Yes. Nearby filings include 912 Red Cliff Dr (addition/remodel to single-story sfr- addition of 385 sq ft space to enlarge kitchen and living room. ceiling will be vaulted, Nov 20, 2025); 914 Red Cliff Dr (replacement of complete existing central heat and air system with or without duct work, Dec 2, 2025); 908 Red Cliff Dr (replacement of complete existing central heat and air system with or without duct work hvac change out, Oct 20, 2026).
How do I get alerts for new permits at 915 Red Cliff Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78758- 912 Red Cliff DrNov 20, 2025Addition/remodel to single-story sfr- addition of 385 sq ft space to enlarge kitchen and living room. ceiling will be vaulted · 47 m away
- 914 Red Cliff DrDec 2, 2025Replacement of complete existing central heat and air system with or without duct work · 51 m away
- 908 Red Cliff DrOct 20, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 69 m away
- 909 Red Cliff DrSep 30, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2t vert gas · 69 m away
- 1003 Red Cliff DrJun 21, 2024Replacement of complete existing central heat and air system with or without duct work · 69 m away
- 912 Cripple Creek DrDec 4, 2023Tunnel under foundation to replace portion of the sewer line · 72 m away
- 1002 Red Cliff DrOct 4, 2024New irrigation to back yard only · 79 m away
- 911 Cripple Creek DrMar 31, 2026Express: foundation repair (installing steel piers) · 83 m away
- 1004 Cripple Creek DrJan 29, 2024Convert existing garage into a bedroom bathroom and a hallway of existing 1 story single-family residence. (refer to expired permit #2015-111744bp) · 84 m away
- 901 Cripple Creek DrJul 2, 2025Replacement of an existing water heater · 99 m away
- 10203 Sun Hill DrNov 5, 2026Replacement of complete existing central heat and air system with or without duct work · 103 m away
- 904 Red Cliff DrAug 23, 2024Replace 40gal water heater with tankless water heater install new gas line · 104 m away