9903 Mearns Meadow Cv

Austin, TX 78758

Austin home gets roof-mounted solar panels and battery

City of Austin records show a roof-mounted solar installation and battery system at this home, permitted on July 16, 2024. The permit describes an 8.0 kWp system with 20 solar panels and a Tesla Powerwall 3. Later electrical permits covered a panel upgrade and a temporary power shutdown to run solar and battery wiring; both are marked final.

Summarized from City of Austin records · updated Dec 10, 2025

Projects
3
3 filings
Latest filing
Dec 10, 2025
since Jul 16, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

We require temporary power shutdown to run the solar and battery wires

  1. AppliedNov 26, 2025
  2. IssuedDec 10, 2025
  3. WorkDec '25 – Apr '26
  4. Final inspectionApr 14, 2026

Passed final inspection Apr 14, 2026.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. We require temporary power shutdown to run the solar and battery wires

    We require temporary power shutdown to run the solar and battery wires

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Panel upgrade

    Panel upgrade

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Roof mount solar panels installation. system size: 8.0 kwp 20 x hyperion solar hy-dh108p8-400b 20 x enphase iq8plus-72-2-us 01 x tesla powerwall 3

    Roof mount solar panels installation. system size: 8.0 kwp 20 x hyperion solar hy-dh108p8-400b 20 x enphase iq8plus-72-2-us 01 x tesla powerwall 3

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 9903 Mearns Meadow Cv

What is being installed at 9903 Mearns Meadow Cv?

A City of Austin permit describes a roof-mounted solar system with 20 panels and a Tesla Powerwall 3. The solar installation permit, 2024-075355 EP, was filed July 16, 2024.

When was the solar installation permitted?

The solar installation permit was filed July 16, 2024. It lists the system size as 8.0 kWp.

Is there a battery system at the home?

The July 16, 2024 permit lists one Tesla Powerwall 3 as part of the solar installation.

Was electrical work also permitted at 9903 Mearns Meadow Cv?

Yes. Permit 2024-129265 EP, filed September 27, 2024, describes a panel upgrade. It is marked final.

What is the latest permit for 9903 Mearns Meadow Cv?

The latest listed filing is electrical permit 2025-151879 EP, filed December 10, 2025. Its description says a temporary power shutdown was needed to run the solar and battery wires; the permit is marked final.

Are these permits for a new home?

The listed permits describe solar and battery wiring and a panel upgrade, not new home construction.

Also being built nearby

All of 78758

More solar installs in 78758.

Email me when a new permit is filed