10903 Grapevine Ln
Austin, TX 78759
10903 Grapevine Ln: 2 projects on record
City of Austin lists 2 filings across 2 projects at 10903 Grapevine Ln, Austin, TX 78759. The most recent, filed May 28, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated May 28, 2024
- Projects
- 2
- 2 filings
- Latest filing
- May 28, 2024
- since May 28, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedMay 25, 2024
- IssuedMay 28, 2024
- WorkMay '24 – May '24
- Final inspectionMay 30, 2024
Passed final inspection May 30, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-066118 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-091327 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10903 Grapevine Ln
What is being built at 10903 Grapevine Ln?
The latest filing (City of Austin permit 2024-066118 MP, May 28, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 10903 Grapevine Ln have?
2 filings across 2 projects, from May 28, 2024 to May 28, 2024.
Is there other construction near 10903 Grapevine Ln?
Yes. Nearby filings include 10907 Grapevine Ln (replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton vertical gas system, Jul 23, 2025); 10906 Grapevine Ln (install evse, Jun 25, 2024); 10809 Sierra Oaks (complete remodel kitchen: new counters cabinets appliances floor paint and trim. complete remodel of fireplace wall and hearth. complete remodel of master bath: new shower counters cabinets flooring paint and tile. complete remodel of hall bath: new shower and tub counters cabinets flooring paint and tile. change flooring in house, Aug 18, 2026).
How do I get alerts for new permits at 10903 Grapevine Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 10907 Grapevine LnJul 23, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton vertical gas system · 36 m away
- 10906 Grapevine LnJun 25, 2024Install evse · 52 m away
- 10809 Sierra OaksAug 18, 2026Complete remodel kitchen: new counters cabinets appliances floor paint and trim. complete remodel of fireplace wall and hearth. complete remodel of master bath: new shower counters cabinets flooring paint and tile. complete remodel of hall bath: new shower and tub counters cabinets flooring paint and tile. change flooring in house · 54 m away
- 10905 Sierra OaksDec 1, 2023Replacement of an existing water heater · 76 m away
- 11003 Grapevine LnMar 26, 2026Express: cosmetic remodel of primary bath and powder bath. no plumbing moves or structural framing. convert primary tub to shower · 81 m away
- 10904 Sierra ColoradoNov 30, 2023Install new roof-mounted solar and energy storage system to existing residence. ae · 88 m away
- 10907 Sierra OaksAug 10, 2026Addition: new one bedroom and one bathroom · 92 m away
- 10904 Sierra OaksDec 2, 2025Replacement of an existing water heater installing a water heater · 103 m away
- 10905 Sierra ColoradoMay 20, 2024Replacement of an existing water heater · 133 m away
- 6300 Sierra TahoeJul 23, 2024Express: window replacement (nine windows like for like) 9 front windows only · 141 m away
- 6401 Heron DrMay 16, 2025Pool demolition -submitted concurrently with new construction so tree review fee is waived ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 155 m away
- 10912 Sierra OaksAug 22, 2025Pool - installation of an in-ground pool with a new concrete deck spa pool & spa coping and equipment pad · 162 m away