11208 Henge Dr
Austin, TX 78759
5.7 kW rooftop solar system permitted at 11208 Henge Dr
Permits indicate a new 5.7 kW rooftop solar system is being installed at an existing residence at 11208 Henge Dr. An electrical permit for power disconnection and reconnection, a service-panel upgrade, and a meter upgrade was filed October 14, 2026; the solar permit was filed October 28, 2026.
Summarized from City of Austin records · updated Oct 28, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 28, 2026
- since Oct 14, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayLogrip - 40-25361 - install new 5.7 kw rooftop solar system to existing residential only backfed breaker only
- AppliedOct 7, 2026
- IssuedOct 28, 2026
- WorkOct '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
2 projectsLogrip - 40-25361 - install new 5.7 kw rooftop solar system to existing residential only backfed breaker only
Logrip - 40-25361 - install new 5.7 kw rooftop solar system to existing residential only backfed breaker only
City of Austin permitElectrical PermitActive- Record
- 2026-132017 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Logrip - 40-25361 - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 125 amp main breaker. upgrading revenue meter to 200 amps. underground service requesting wire pull
Logrip - 40-25361 - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 125 amp main breaker. upgrading revenue meter to 200 amps. underground service requesting wire pull
City of Austin permitElectrical PermitFinal- Record
- 2026-133819 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11208 Henge Dr
What is being installed at 11208 Henge Dr?
A City of Austin electrical permit indicates a new 5.7 kW rooftop solar system at the existing residence. The permit, 2026-132017 EP, was filed October 28, 2026.
Is 11208 Henge Dr getting rooftop solar?
Yes. Permit 2026-132017 EP, filed October 28, 2026, describes installation of a 5.7 kW rooftop solar system.
Are electrical upgrades also planned at 11208 Henge Dr?
A separate electrical permit describes disconnecting and reconnecting power to tie in the solar component, upgrading the main service panel to 200 amps, and upgrading the revenue meter to 200 amps. The permit, 2026-133819 EP, was filed October 14, 2026.
When was the solar permit filed for 11208 Henge Dr?
The City of Austin filed permit 2026-132017 EP on October 28, 2026. It describes a new 5.7 kW rooftop solar system.
What do the permits say about the main breaker at 11208 Henge Dr?
The October 14, 2026 permit describes upgrading the main service panel to 200 amps and specifies a 125-amp main breaker. It also describes upgrading the revenue meter to 200 amps.
Also being built nearby
All of 78759- 11109 Blackmoor DrAug 18, 2026Replacement of complete existing central heat and air system with or without duct work · 48 m away
- 11201 Blackmoor DrApr 21, 2025Replacement of complete existing central heat and air system with or without duct work mechanical closet located in hallway · 57 m away
- 11107 Blackmoor DrMay 29, 2025Replacement of complete existing central heat and air system with or without duct work · 58 m away
- 11101 Blackmoor DrSep 4, 2026Express - remove and replace 1 window like for like no structural changes. 1sliding rear door only · 83 m away
- 11217 Henge DrSep 4, 2025Permit required for outage. outage needed to tie in solar system. please reference auxiliary permit 2025-098324 ep · 97 m away
- 11210 Barrington WayJul 29, 2026Replacement of an existing water heater 50 gallon nat gas water heater replacement · 103 m away
- 11222 Barrington WaySep 29, 2026Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 11131 Henge DrApr 21, 2026Replacement of complete existing central heat and air system with or without duct work · 109 m away
- 11108 Blackmoor DrApr 21, 2026My customer wants to upgrade the main electrical panel. the actual panel doesnt have a main breaker. i will use 2/0 copper thhn for the installation · 112 m away
- 11208 Barrington WayJul 8, 2025Replacment of 40 gallon gas water heater · 116 m away
- 11106 Blackmoor DrDec 9, 2025Upgrade existing overhead electrical service · 119 m away
- 10508 Oak View DrFeb 9, 2026Service upgrade of 125amp overhead service with no main to new 200amp overhead · 126 m away
More solar installs in 78759.