5.7 kW rooftop solar system permitted at 11208 Henge Dr

Permits indicate a new 5.7 kW rooftop solar system is being installed at an existing residence at 11208 Henge Dr. An electrical permit for power disconnection and reconnection, a service-panel upgrade, and a meter upgrade was filed October 14, 2026; the solar permit was filed October 28, 2026.

Summarized from City of Austin records · updated Oct 28, 2026

Projects
2
2 filings
Latest filing
Oct 28, 2026
since Oct 14, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Logrip - 40-25361 - install new 5.7 kw rooftop solar system to existing residential only backfed breaker only

  1. AppliedOct 7, 2026
  2. IssuedOct 28, 2026
  3. WorkOct '26 – Apr '27
  4. Final inspection
12% through of the permit windowOct 28, 2026 → Apr 26, 2027

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Logrip - 40-25361 - install new 5.7 kw rooftop solar system to existing residential only backfed breaker only

    Logrip - 40-25361 - install new 5.7 kw rooftop solar system to existing residential only backfed breaker only

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Logrip - 40-25361 - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 125 amp main breaker. upgrading revenue meter to 200 amps. underground service requesting wire pull

    Logrip - 40-25361 - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 125 amp main breaker. upgrading revenue meter to 200 amps. underground service requesting wire pull

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 11208 Henge Dr

What is being installed at 11208 Henge Dr?

A City of Austin electrical permit indicates a new 5.7 kW rooftop solar system at the existing residence. The permit, 2026-132017 EP, was filed October 28, 2026.

Is 11208 Henge Dr getting rooftop solar?

Yes. Permit 2026-132017 EP, filed October 28, 2026, describes installation of a 5.7 kW rooftop solar system.

Are electrical upgrades also planned at 11208 Henge Dr?

A separate electrical permit describes disconnecting and reconnecting power to tie in the solar component, upgrading the main service panel to 200 amps, and upgrading the revenue meter to 200 amps. The permit, 2026-133819 EP, was filed October 14, 2026.

When was the solar permit filed for 11208 Henge Dr?

The City of Austin filed permit 2026-132017 EP on October 28, 2026. It describes a new 5.7 kW rooftop solar system.

What do the permits say about the main breaker at 11208 Henge Dr?

The October 14, 2026 permit describes upgrading the main service panel to 200 amps and specifies a 125-amp main breaker. It also describes upgrading the revenue meter to 200 amps.

Also being built nearby

All of 78759

More solar installs in 78759.

Email me when it passes final inspection