Hyde Park Baptist Church's Quarries multi-use plan was aborted
Austin records show a site plan for Hyde Park Baptist Church Quarries Multi-Use Facility was approved and released on Sept. 3, 2019. A second case for the facility, filed Sept. 19, 2025, is marked aborted. A separate filing dated Oct. 1, 2026, describes converting an existing Christian Life Center to a middle school.
Summarized from City of Austin records · updated Sep 19, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 19, 2025
- since Sep 3, 2019
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 11400 Mopac Expy Svrd
What is being built at 11400 Mopac Expy Svrd?
A site plan for Hyde Park Baptist Church Quarries Multi-Use Facility was approved and released in 2019. A later case for the facility is marked aborted.
Is Hyde Park Baptist Church building a multi-use facility in Austin?
Austin case 11941882, filed Sept. 3, 2019, was approved and released. A later case, 12326301, filed Sept. 19, 2025, is marked aborted.
What is the status of the Quarries Multi-Use Facility plan?
The 2019 site plan case was approved and released. The 2025 case for the same facility is marked aborted.
Is a school planned at 11400 Mopac?
A separate filing dated Oct. 1, 2026, describes changing the use of a church to a private school by converting an existing Christian Life Center into a middle school.
What was filed at 11400 Mopac in 2025?
Austin case 12326301 was filed Sept. 19, 2025, for Hyde Park Baptist Church Quarries Multi-Use Facility. Its status is Aborted.
Also being built nearby
All of 78759- 11400 N Mopac Expy Svrd SbOct 1, 2026Change of use church to private school-conversion of existing christian life center to become middle school
- 4219 Red Cloud DrJul 16, 2025Upgrading utility meter to a 200 amp meter for solar/battery installation & upgrading main panel to 200-amp panel · 187 m away
- 4213 Red Cloud DrOct 22, 2025Replacement of complete existing central heat and air system with or without duct work hvac change out · 196 m away
- 4100 Balcones Woods DrMar 24, 2025200a upgrade service to electrical system. request to disconnect per cdp · 240 m away
- 4104 Balcones Woods DrJul 8, 2024Replacement of an existing water heater in garage · 244 m away
- 4102 Balcones Woods DrOct 10, 2024Addition of primary suite above new covered patio new bathroom (water meter upgrade required) · 244 m away
- 4008 Balcones Woods DrNov 14, 2025Express - replace windows with same size windows · 245 m away
- 4102 Flagstaff DrJan 31, 2025Express - replace tub with acrylic shower base and walls replace vanity floors valves and fixtures · 249 m away
- 4203 Red Cloud DrDec 6, 2023Addition of a dining room to rear of existing 2-story sfr. reconfigure kitchen and laundry room. install new tankless water heater. remove uncovered balcony. retroactively permit uncovered wood deck addition at rear of existing 2-story sfr · 257 m away
- 4303 Red Cloud DrJun 17, 2025Express - replacing 2 windows like for like · 270 m away
- 4205 Zuni DrMay 8, 2026Replacement of an existing water heater replace navien 240a2 tankless system located: in garage closet · 276 m away
- 4202 Zuni DrSep 30, 20241 prv installation 1 gas water heter changout pressure reducing valve · 279 m away