Level 2 EV charger permitted at 11500 Autumn Ridge Dr
A City of Austin electrical permit filed October 24, 2025, covers a Level 2 EV charger at 11500 Autumn Ridge Dr. The permit describes a 40-amp circuit breaker and a new 50-amp Siemens subpanel powered by a 50-amp circuit breaker; its status is Final.
Summarized from City of Austin records · updated Oct 24, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 24, 2025
- since Oct 24, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledLevel 2 ev charger powered by a 40amp circuit breaker and a new 50amp sub panel siemens powered by 50amp circuit breaker
- AppliedSep 26, 2025
- IssuedOct 24, 2025
- WorkOct '25 – Apr '26
- Final inspectionApr 24, 2026
Passed final inspection Apr 24, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectLevel 2 ev charger powered by a 40amp circuit breaker and a new 50amp sub panel siemens powered by 50amp circuit breaker
Level 2 ev charger powered by a 40amp circuit breaker and a new 50amp sub panel siemens powered by 50amp circuit breaker
City of Austin permitElectrical PermitFinal- Record
- 2025-123171 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11500 Autumn Ridge Dr
What is being built at 11500 Autumn Ridge Dr?
A City of Austin permit covers installation of a Level 2 EV charger. The permit describes a 40-amp circuit breaker and a new 50-amp Siemens subpanel.
When was the EV charger permitted at 11500 Autumn Ridge Dr?
The electrical permit was filed on October 24, 2025. Its status is listed as Final.
What is the permit number for the EV charger at 11500 Autumn Ridge Dr?
The City of Austin permit number is 2025-123171 EP. It was filed October 24, 2025.
Will the charger at 11500 Autumn Ridge Dr be open to the public?
The permit identifies a Level 2 EV charger, but does not say whether it will be available to the public.
What electrical work is listed for 11500 Autumn Ridge Dr?
The permit describes a 40-amp circuit breaker and a new 50-amp Siemens subpanel powered by a 50-amp circuit breaker, for a Level 2 EV charger.
Also being built nearby
All of 78759- 11502 Autumn Ridge DrMay 19, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 29 m away
- 11504 Autumn Ridge DrAug 14, 2026Replacement of complete existing central heat and air system with or without duct work · 50 m away
- 6500 Danwood DrJun 9, 2025Replacement of an existing water heater replace existing water heater with new one · 87 m away
- 11504 Juniper Ridge DrMay 6, 2024Replacement of complete existing central heat and air system with or without duct work · 108 m away
- 11507 Autumn Ridge DrAug 18, 2026Replacement of an existing water heater replace ng water heater · 116 m away
- 11505 Three Oaks TrlFeb 19, 2025Replacement of an existing water heater · 123 m away
- 11508 Juniper Ridge DrJun 1, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 4 ton ac system · 136 m away
- 11511 Juniper Ridge DrMar 27, 2026Express- remove and replace aluminum siding and 7 windows · 143 m away
- 11507 Three Oaks TrlDec 5, 2023Replacement of complete existing central heat and air system with or without duct work · 143 m away
- 6407 Danwood DrDec 22, 2025Tunnel under slab to make a spot repair to a broken pipe/fitting · 146 m away
- 6602 Danwood DrJan 3, 2025(yong lee kee) - installation of circuit for elec. vehicle charging station - esip · 147 m away
- 6704 Rustling Oaks TrlNov 16, 2023Installation of new solar system · 148 m away