11503 Sherwood Forest
Austin, TX 78759
11503 Sherwood Forest: 1 project on record
City of Austin lists 1 filing across 1 project at 11503 Sherwood Forest, Austin, TX 78759. The most recent, filed December 10, 2024, covers: “Trench out existing sewer yard line and replace with schedule 40 pvc”.
Compiled from City of Austin records · updated Dec 10, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 10, 2024
- since Dec 10, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTrench out existing sewer yard line and replace with schedule 40 pvc
- AppliedDec 2, 2024
- IssuedDec 10, 2024
- WorkDec '24 – Dec '24
- Final inspectionDec 18, 2024
Passed final inspection Dec 18, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectTrench out existing sewer yard line and replace with schedule 40 pvc
Trench out existing sewer yard line and replace with schedule 40 pvc
City of Austin permitPlumbing PermitFinal- Record
- 2024-157843 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11503 Sherwood Forest
What is being built at 11503 Sherwood Forest?
The latest filing (City of Austin permit 2024-157843 PP, December 10, 2024) covers trench out existing sewer yard line and replace with schedule 40 pvc.
How many permits and filings does 11503 Sherwood Forest have?
1 filing across 1 project, from December 10, 2024 to December 10, 2024.
Is there other construction near 11503 Sherwood Forest?
Yes. Nearby filings include 11600 Sherwood Forest (replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton horizontal gas system, Aug 21, 2025); 11601 Sherwood Forest (replacement of complete existing central heat and air system with or without duct work ronald tartt - replacing like for like 4t horz gas system, Nov 10, 2025); 11708 Barrington Way (first-floor interior remodel of existing single-family residence. work includes kitchen remodel interior wall modifications vaulted kitchen ceiling with skylights master suite reconfiguration window replacement within existing openings electrical/plumbing/mechanical updates insulation upgrades and interior finish work. no increase to building footprint or conditioned floor area. structural modifications reviewed by licensed professional engineer, Jun 17, 2026).
How do I get alerts for new permits at 11503 Sherwood Forest?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 11600 Sherwood ForestAug 21, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton horizontal gas system · 51 m away
- 11601 Sherwood ForestNov 10, 2025Replacement of complete existing central heat and air system with or without duct work ronald tartt - replacing like for like 4t horz gas system · 62 m away
- 11708 Barrington WayJun 17, 2026First-floor interior remodel of existing single-family residence. work includes kitchen remodel interior wall modifications vaulted kitchen ceiling with skylights master suite reconfiguration window replacement within existing openings electrical/plumbing/mechanical updates insulation upgrades and interior finish work. no increase to building footprint or conditioned floor area. structural modifications reviewed by licensed professional engineer · 70 m away
- 11602 Sherwood ForestMar 20, 2024Replacement of complete existing central heat and air system with or without duct work · 73 m away
- 11603 Sherwood ForestMay 13, 2024Replacement of complete existing central heat and air system with or without duct work · 78 m away
- 11701 Barrington WayAug 31, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 85 m away
- 7805 Scotland YardOct 28, 2026Express- replace siding around home and behind electrical box. the electrical permit is a child of the building permit · 90 m away
- 11703 Barrington WayNov 11, 2025Addition and remodel interior: remodel of bathroom kitchen. electrical upgrades. exterior: new covered patio - to be constructed to the same extent as existing concrete slab near to tree · 90 m away
- 11507 Queens WayMar 17, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 5 ton ac system · 91 m away
- 11605 Barrington WayJan 14, 2025Replacement of complete existing central heat and air system with or without duct work single stage 3-ton 410-a refrigerant 80% natural gas heat · 98 m away
- 11707 Barrington WayMay 24, 2024Underground service upgrade replacing meter and panel to 200 amp · 103 m away
- 11504 Queens WayJun 10, 2026Demolition old driveway. construct new driveway approach of 17 ft · 105 m away