11506 Charred Oak Dr
Austin, TX 78759
200-amp service upgrade and EV charger at 11506 Charred Oak Dr
A residential electrical permit indicates an upgrade from 125-amp to 200-amp service and installation of a 60-amp EV charging station at 11506 Charred Oak Dr. The permit was filed September 10, 2026, and is marked final. An earlier irrigation-system permit, filed May 2, 2024, is marked expired.
Summarized from City of Austin records · updated Sep 10, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 10, 2026
- since May 2, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledService upgrade of existing 125amp underground to a new 200amp. installation of a 60amp ev charging station
- AppliedAug 26, 2026
- IssuedSep 10, 2026
- WorkSep '26 – Oct '26
- Final inspectionOct 6, 2026
Passed final inspection Oct 6, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsService upgrade of existing 125amp underground to a new 200amp. installation of a 60amp ev charging station
Service upgrade of existing 125amp underground to a new 200amp. installation of a 60amp ev charging station
City of Austin permitElectrical PermitFinal- Record
- 2026-111901 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Irrigation system installation
Irrigation system installation
City of Austin permitPlumbing PermitExpired- Record
- 2024-054309 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11506 Charred Oak Dr
What is being built at 11506 Charred Oak Dr?
A City of Austin electrical permit describes a service upgrade and installation of a 60-amp EV charging station. It does not describe a new building.
Is an EV charger being installed at 11506 Charred Oak Dr?
Yes. Permit 2026-111901 EP describes installation of a 60-amp EV charging station alongside an electrical service upgrade.
When was the EV charger permit filed?
The City of Austin permit was filed September 10, 2026. Its status is listed as final.
What electrical work is planned at 11506 Charred Oak Dr?
Permit 2026-111901 EP describes upgrading the existing 125-amp underground service to 200 amps and installing a 60-amp EV charging station.
Is a new house being built at 11506 Charred Oak Dr?
The two records listed for this address do not describe new home construction. They cover an electrical service upgrade and EV charger, plus an earlier irrigation-system permit.
Was an irrigation system permitted at 11506 Charred Oak Dr?
A plumbing permit for irrigation-system installation was filed May 2, 2024, and is marked expired.
Also being built nearby
All of 78759- 11421 Pradera DrMar 6, 2025Express: replace siding by the front and back of the house · 57 m away
- 11417 Pradera DrMar 24, 2026Hardwire ev charger in garage · 81 m away
- 11508 Sweetshade LnJun 30, 2025Installation of residential ev charging station · 83 m away
- 11500 Sweetshade LnApr 6, 2024Express replace 3 existing windows patio door and bathroom window only per owner · 90 m away
- 11417 Charred Oak DrOct 7, 2024Upgrading existing underground service meter and panel · 101 m away
- 11522 Antigua DrMay 28, 2025New pool & spa for new 1-story sfr with a fence 4 in height max 4 opening gates must be equipped with self-closing and self-latching device required · 104 m away
- 11518 Antigua DrMar 5, 2025New construction of 525 sq ft in-ground pool · 107 m away
- 11505 D K Ranch RdFeb 7, 2024I am upgrading panel and meter can to 200 amp for this house · 112 m away
- 11413 Pradera DrAug 20, 2024Interior remodel · 115 m away
- 11604 Sweetshade LnJan 20, 2026Interior remodel: full home remodel master bathroom remodel guest bathroom remodel - see application for full scope of work · 135 m away
- 11512 Antigua DrMar 18, 2024Replace windows size for size · 136 m away
- 11523 Antigua DrFeb 26, 2026Replacement of an existing water heater replace existing 50-gallon gas water heater in garage closet including new expansion tank and reconnection to existing gas water and vent lines. no structural change · 150 m away