11702 Fast Horse Dr
Austin, TX 78759
11702 Fast Horse Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 11702 Fast Horse Dr, Austin, TX 78759. The most recent, filed September 30, 2024, covers: “Tunnel to repair sewer piping below the slab”.
Compiled from City of Austin records · updated Sep 30, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 30, 2024
- since Sep 30, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel to repair sewer piping below the slab
- AppliedSep 17, 2024
- IssuedSep 30, 2024
- WorkSep '24 – Oct '24
- Final inspectionOct 17, 2024
Passed final inspection Oct 17, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel to repair sewer piping below the slab
Tunnel to repair sewer piping below the slab
City of Austin permitPlumbing PermitFinal- Record
- 2024-126109 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11702 Fast Horse Dr
What is being built at 11702 Fast Horse Dr?
The latest filing (City of Austin permit 2024-126109 PP, September 30, 2024) covers tunnel to repair sewer piping below the slab.
How many permits and filings does 11702 Fast Horse Dr have?
1 filing across 1 project, from September 30, 2024 to September 30, 2024.
Is there other construction near 11702 Fast Horse Dr?
Yes. Nearby filings include 11703 Elk Park Trl (replacement of complete existing central heat and air system with or without duct work, Jun 5, 2024); 11620 Fast Horse Dr (service rebuild, Mar 22, 2024); 11623 Fast Horse Dr (service rebuild replace existing service with 150 amp. install new ev charger circuit, Sep 14, 2026).
How do I get alerts for new permits at 11702 Fast Horse Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 11703 Elk Park TrlJun 5, 2024Replacement of complete existing central heat and air system with or without duct work · 37 m away
- 11620 Fast Horse DrMar 22, 2024Service rebuild · 52 m away
- 11623 Fast Horse DrSep 14, 2026Service rebuild replace existing service with 150 amp. install new ev charger circuit · 57 m away
- 11704 Elk Park TrlNov 1, 2024Replacement of complete existing central heat and air system with or without duct work · 84 m away
- 11702 Elk Park TrlApr 14, 2026Replacement of an existing water heater · 85 m away
- 11616 Fast Horse DrJul 12, 2024Replacement of complete existing central heat and air system with or without duct work · 86 m away
- 5104 Powder River RdJun 23, 2025Emergency replacement of outdoor panel & meter socket due to burnt wires in panel & burnt neutral bar · 91 m away
- 5021 Dull Knife DrJan 13, 2025Replacement of complete existing central heat and air system with or without duct work we will be installing a new 3 ton r454b system trane unit on this house. -new pad -new disconnect box with electrical whip -new filter base -new eco bee thermostat -new plenum transition -new platform. -new gas valve · 96 m away
- 4903 Big Trail CirMar 31, 2026I am upgrading outdoor panel to 200 amp · 103 m away
- 11615 Elk Park TrlAug 25, 2026Base: installing a backup battery system and additional meter socket · 110 m away
- 11615 Fast Horse DrSep 24, 2025Replacement of an existing water heater 40-50 gal standard use tank 40-50 gal standard use tank water heater change out · 110 m away
- 11612 Fast Horse DrAug 14, 2026Move gas line 25 to reposition stove · 118 m away