groundranger
Active · latest filing Aug 2026Residential

11803 Knights Brg

Austin, TX 78759

Electrical service rebuild permitted at 11803 Knights Brg

An electrical service rebuild was permitted at 11803 Knights Brg in Austin on August 28, 2026. The City of Austin permit describes a new meter can, main breaker panel, grounding and bonding, and a required shutdown.

Summarized from City of Austin records · updated Aug 28, 2026

Projects
1
1 filings
Latest filing
Aug 28, 2026
since Aug 28, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Rebuild electrical service: new meter can main breaker panel grounding and bonding ae schedule shutdown required

  1. AppliedAug 26, 2026
  2. IssuedAug 28, 2026
  3. WorkAug '26 – Sep '26
  4. Final inspectionSep 4, 2026

Passed final inspection Sep 4, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Rebuild electrical service: new meter can main breaker panel grounding and bonding ae schedule shutdown required

    Rebuild electrical service: new meter can main breaker panel grounding and bonding ae schedule shutdown required

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 11803 Knights Brg

What work is being done at 11803 Knights Brg in Austin?

A City of Austin permit describes rebuilding the electrical service, including a new meter can, main breaker panel, grounding and bonding.

When was the electrical permit filed for 11803 Knights Brg?

The permit was filed on August 28, 2026. It is permit 2026-111956 EP.

What is permit 2026-111956 EP for?

It covers an electrical service rebuild with a new meter can and main breaker panel, plus grounding and bonding. The permit notes that a shutdown is required.

Is a new building being built at 11803 Knights Brg?

The available City of Austin record is for an electrical permit, not a new-building permit. It describes rebuilding the electrical service.

What does the permit say about electrical work at 11803 Knights Brg?

The permit describes a new meter can, main breaker panel, grounding and bonding, and a required shutdown. Its status is listed as Final.

Also being built nearby

All of 78759
Email me when a new permit is filed