3851 Airport Blvd
Austin, TX 78759 · David Petrick Company, Inc.
Sherwin-Williams interior renovation at 3851 Airport Blvd
A 5,928-square-foot interior renovation for Sherwin-Williams is registered at 3851 Airport Blvd. The TDLR project registration, filed June 25, 2025, describes new interior walls, an accessory office and employee workspace, and a restroom renovation. The applicant estimated the project cost at $450,000.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 25, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 25, 2025
- since Jun 25, 2025
- Largest scope
- 5,928 sf
- Estimated cost
- $450K
- state registration
Where this project stands
Finishing up · inspection nextSherwin 721146 Austin Airport Blvd East
5,928 sq ft · $450K est.
- RegisteredJun 25, 2025
- Plan review
- ConstructionSep '25 – Dec '25
- Inspectednow
- Closed
Scheduled to finish Dec 31, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 4 phone numbers
Permit & project history
1 project5,928 sq ft: demolish interior non-load bearing walls, remove existing finishes, construct new interior non-loadbearing walls, new office (accessory), new employee work space, renovate existing restroom — sherwin williams
TDLR project registrationRenovation/AlterationReview Complete5,928 sq ft$450K est.- Project #
- TABS2025022081
- Tenant / owner
- Sherwin 721146 Austin Airport Blvd East
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3851 Airport Blvd
What is being built at 3851 Airport Blvd?
A TDLR registration describes a 5,928-square-foot interior renovation for Sherwin-Williams, including an accessory office, employee workspace, and restroom renovation.
Is Sherwin-Williams renovating its space at 3851 Airport Blvd?
Yes. The registration filed June 25, 2025, describes removing existing finishes and non-load-bearing walls, building new interior walls, and renovating a restroom.
When was the 3851 Airport Blvd project filed?
The TDLR project registration was filed June 25, 2025. Its project number is TABS2025022081.
How large is the Sherwin-Williams renovation on Airport Blvd?
The registered renovation covers 5,928 square feet.
How much will the 3851 Airport Blvd renovation cost?
The applicant estimated the project cost at $450,000, according to the TDLR registration.
What is being renovated near R1p1 Holdings on Airport Blvd?
At 3851 Airport Blvd, about 103 meters from R1p1 Holdings, a TDLR registration describes a 5,928-square-foot Sherwin-Williams interior renovation.
Also being built nearby
All of 78759- 3851 Airport BlvdApr 20, 2026Sw sign b
- 3851 Airport Blvd · Dollar Tree @ Airline CrossingJun 6, 2025Dollar tree — renovation/alteration — interior renovation - removing previous tenant fixture and finishes and graphics. install new store gondola, pre-fab office system, new finishes and relamp lighting to led. modify toilet rooms 9,879 sq ft
- 3850 Airport BlvdFeb 11, 2026Renovation of an existing bar to a pizzeria bar · 36 m away
- 3848 Airport BlvdMay 24, 2024Overlay - install 15 year 49 mill pvc duro-last single ply roof system over existing roof in field and up and over parapet walls.detach and reset coping cap.flash all penetrations with duro-last flashing.replace damaged skylight domes · 70 m away
- 3823 Airport BlvdMar 25, 2026Rooftop solar ballasted with line side tap (unit b) · 98 m away
- 1825 E 38th Half StSep 19, 2024Reroof · 103 m away
- 3822 Aiport Blvd · R1p1 Holdings LLCOct 27, 2025Airport blvd tenant improvement — renovation/alteration — 5,500 sq ft renovation to existing tilt wall shell space · 103 m away
- 3822 Airport Blvd · R1p1 Holdings LLCOct 16, 2026Tenant fit out of existing building including demolition and new interior construction of offices and a podcast studio. building will be demised into 2 suites under this permit. concurrent - 2025-131330 da · 103 m away
- 1924 E 38th Half StJul 23, 2024Replacement of complete existing central heat and air system with or without duct work · 114 m away
- 3811 Grayson LnJun 2, 2026Building. 1: new single story sfr with 1 bedroom 1 bathroom covered front porch and uncovered wood deck · 138 m away
- 3901 Grayson LnFeb 22, 2024Gas pressure test · 145 m away
- 3907 Grayson LnDec 3, 2024Replacement of complete existing central heat and air system with or without duct work · 148 m away