4103 Villacliff Cir
Austin, TX 78759
4103 Villacliff Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 4103 Villacliff Cir, Austin, TX 78759. The most recent, filed September 23, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Sep 23, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 23, 2025
- since Sep 23, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedSep 22, 2025
- IssuedSep 23, 2025
- WorkSep '25 – Oct '25
- Final inspectionOct 15, 2025
Passed final inspection Oct 15, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-120486 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4103 Villacliff Cir
What is being built at 4103 Villacliff Cir?
The latest filing (City of Austin permit 2025-120486 MP, September 23, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 4103 Villacliff Cir have?
1 filing across 1 project, from September 23, 2025 to September 23, 2025.
Is there other construction near 4103 Villacliff Cir?
Yes. Nearby filings include 4200 Greenridge Pl (replacement of complete existing central heat and air system with or without duct work, Jun 30, 2025); 4203 Greenridge Pl (electrical connection from house to new backyard shed as an office space via sub panel. the office will consist of electrical outlets and lights. shed is 192 square feet, Aug 16, 2024); 8903 Rockcrest Dr (addition/remodel to existing sfr to convert existing garage into family room. addition include new bedroom bathroom and office + new attached garage, Oct 7, 2026).
How do I get alerts for new permits at 4103 Villacliff Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 4200 Greenridge PlJun 30, 2025Replacement of complete existing central heat and air system with or without duct work · 72 m away
- 4203 Greenridge PlAug 16, 2024Electrical connection from house to new backyard shed as an office space via sub panel. the office will consist of electrical outlets and lights. shed is 192 square feet · 78 m away
- 8903 Rockcrest DrOct 7, 2026Addition/remodel to existing sfr to convert existing garage into family room. addition include new bedroom bathroom and office + new attached garage · 101 m away
- 4201 Cliffwood CvJun 21, 2024New pool (with heater or autofill) required enclosure elevated patio space and pool deck · 104 m away
- 4201 Hycrest DrFeb 18, 2026Removing existing electrical panel and meter enclosure. installing new 200amp main breaker panel. installing an austin energy approved meter enclosure. repairing the riser due to existing old cloth wire. new riser to be ridged conduit · 126 m away
- 9006 Rockcrest DrMay 30, 2024Replace sewer yard line from house connection to city tap · 127 m away
- 9005 Rockcrest DrJun 17, 2025Interior remodel - moving interior walls to open a room - replacing existing beam and load bearing wall demolition existing attached covered front porch · 130 m away
- 8803 Westbluff CirNov 4, 2026New inground swimming pool with reqd enclosure device for existing 2-story single family residence · 144 m away
- 4104 Hycrest DrSep 9, 2026Replacement of complete existing central heat and air system with or without duct work jeff brenner · 147 m away
- 8807 Wildridge DrJan 3, 2025Replacement of an existing water heater · 148 m away
- 8802 Westbluff CirDec 22, 2025Replacement of complete existing central heat and air system with or without duct work · 149 m away
- 9008 Rockcrest DrMay 22, 2026Install level 2 ev charger · 157 m away