groundranger
Historic · latest filing Apr 2025Residential

4302 Cliffwood Cir

Austin, TX 78759

Rooftop solar and battery storage replacement in Austin

City of Austin permits dated April 23, 2025, cover replacing the existing rooftop solar system at this residence with a 15.64 kW system and installing 15 kW of energy storage. A second electrical permit covers disconnecting and reconnecting the home for the installation.

Summarized from City of Austin records · updated Apr 23, 2025

Projects
2
2 filings
Latest filing
Apr 23, 2025
since Apr 23, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacing existing solar energy system with new 15.64 kw rooftop solar and 15 kw energy storage system on existing residential only

  1. AppliedApr 14, 2025
  2. IssuedApr 23, 2025
  3. WorkApr '25 – Oct '25
  4. Final inspectionJun 16, 2025

Passed final inspection Jun 16, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replacing existing solar energy system with new 15.64 kw rooftop solar and 15 kw energy storage system on existing residential only

    Replacing existing solar energy system with new 15.64 kw rooftop solar and 15 kw energy storage system on existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Disconnect/reconnect for solar and energy storage installation at existing residence

    Disconnect/reconnect for solar and energy storage installation at existing residence

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4302 Cliffwood Cir

What is being installed at 4302 Cliffwood Cir?

City of Austin permits cover a replacement rooftop solar system rated at 15.64 kW and a 15 kW energy storage system at the existing residence.

Is a new house being built at 4302 Cliffwood Cir?

No new house is described in the permit records. They cover replacing solar equipment and installing energy storage at an existing residence.

When were the solar permits filed for 4302 Cliffwood Cir?

Both City of Austin electrical permits were filed on April 23, 2025. Their permit numbers are 2025-045293 EP and 2025-046341 EP.

How large is the solar system at 4302 Cliffwood Cir?

The permit description specifies a new rooftop solar system rated at 15.64 kW, replacing the existing system.

Is battery storage included at 4302 Cliffwood Cir?

Yes. The permit description includes a 15 kW energy storage system alongside the replacement rooftop solar system.

What does permit 2025-046341 EP cover?

The April 23, 2025, City of Austin electrical permit covers disconnecting and reconnecting the residence for the solar and energy storage installation.

Also being built nearby

All of 78759

More warehouses & industrial in 78759, solar installs in 78759.

Email me when a new permit is filed