4400 Flagstaff Dr
Austin, TX 78759
4400 Flagstaff Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 4400 Flagstaff Dr, Austin, TX 78759 since November 16, 2023. The most recent, filed November 27, 2023, covers: “Install gas supply to emergency generator from gas meter. generac 22kw. 60ft 1 1/4 piping for 60ft developed length. 281cubic ft/hr @ full load”.
Compiled from City of Austin records · updated Nov 27, 2023
- Projects
- 2
- 2 filings
- Latest filing
- Nov 27, 2023
- since Nov 16, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall gas supply to emergency generator from gas meter. generac 22kw. 60ft 1 1/4 piping for 60ft developed length. 281cubic ft/hr @ full load
- AppliedNov 25, 2023
- IssuedNov 27, 2023
- WorkNov '23 – Nov '23
- Final inspectionNov 30, 2023
Passed final inspection Nov 30, 2023.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall gas supply to emergency generator from gas meter. generac 22kw. 60ft 1 1/4 piping for 60ft developed length. 281cubic ft/hr @ full load
Install gas supply to emergency generator from gas meter. generac 22kw. 60ft 1 1/4 piping for 60ft developed length. 281cubic ft/hr @ full load
City of Austin permitPlumbing PermitFinal- Record
- 2023-151403 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Disconnect/reconnect for install of a transfer switch for new generator
Disconnect/reconnect for install of a transfer switch for new generator
City of Austin permitElectrical PermitFinal- Record
- 2023-146339 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4400 Flagstaff Dr
What is being built at 4400 Flagstaff Dr?
The latest filing (City of Austin permit 2023-151403 PP, November 27, 2023) covers install gas supply to emergency generator from gas meter. generac 22kw. 60ft 1 1/4 piping for 60ft developed length. 281cubic ft/hr @ full load.
How many permits and filings does 4400 Flagstaff Dr have?
2 filings across 2 projects, from November 16, 2023 to November 27, 2023.
Is there other construction near 4400 Flagstaff Dr?
Yes. Nearby filings include 4402 Flagstaff Dr (install a backflow preventer for lawn irrigation, Nov 20, 2024); 4307 Flagstaff Dr (replacement of complete existing central heat and air system with or without duct work like for like: 4 ton gas vertical system, Dec 2, 2025); 4404 Flagstaff Dr (installation pv modules on existing residential roof, Mar 14, 2024).
How do I get alerts for new permits at 4400 Flagstaff Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 4402 Flagstaff DrNov 20, 2024Install a backflow preventer for lawn irrigation · 30 m away
- 4307 Flagstaff DrDec 2, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton gas vertical system · 55 m away
- 4404 Flagstaff DrMar 14, 2024Installation pv modules on existing residential roof · 62 m away
- 4305 Flagstaff DrAug 30, 2024Replacement of complete existing central heat and air system with or without duct work · 73 m away
- 4405 Flagstaff DrMay 12, 2026Replacement of complete existing central heat and air system with or without duct work · 77 m away
- 4307 Flagstaff CirFeb 18, 2026Replacement of an existing water heater replace ng water heater · 118 m away
- 4301 Flagstaff CirMay 23, 2024Replacement of complete existing central heat and air system without duct work · 120 m away
- 4300 Flagstaff DrAug 28, 2026Excavate 20 tunnel to repair main drain line under house · 130 m away
- 4501 Malaga DrJan 15, 2024Express: replace windows and patio door like for like · 137 m away
- 4207 Flagstaff DrApr 21, 2026Install/replace 200 amp main breaker panel and meter can (overhead) · 146 m away
- 4502 Malaga DrJun 26, 2025Amended plat of lots 3 & 4, blk a, balcones woods sec. four · 151 m away
- 4500 Alamosa DrSep 27, 2024Replacement of complete existing central heat and air system with or without duct work · 153 m away