5709 Painted Valley Dr
Austin, TX 78759
5709 Painted Valley Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 5709 Painted Valley Dr, Austin, TX 78759 since December 27, 2023. The most recent, filed June 14, 2024, covers: “Kinsey will make access through slab in downstairs master bathroom floor we will tunnel up to 35 ft to gain access to master bathroom shower sinks and toilet along with washing machine line where it ties into main sewer. kinsey will remove and replace all pvc in tunnel roughly 25 ft 3 and 20 ft of 2 pvc with new schedule 40 pvc in its lace and hang via clevis hangers from slab every 6 ft”.
Compiled from City of Austin records · updated Jun 14, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Jun 14, 2024
- since Dec 27, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledKinsey will make access through slab in downstairs master bathroom floor we will tunnel up to 35 ft to gain access to master bathroom shower sinks and toilet along with washing machine line where it ties into main sewer. kinsey will remove and replace all pvc in tunnel roughly 25 ft 3 and 20 ft of 2 pvc with new schedule 40 pvc in its lace and hang via clevis hangers from slab every 6 ft
- AppliedJun 11, 2024
- IssuedJun 14, 2024
- WorkJun '24 – Jun '24
- Final inspectionJun 17, 2024
Passed final inspection Jun 17, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsKinsey will make access through slab in downstairs master bathroom floor we will tunnel up to 35 ft to gain access to master bathroom shower sinks and toilet along with washing machine line where it ties into main sewer. kinsey will remove and replace all pvc in tunnel roughly 25 ft 3 and 20 ft of 2 pvc with new schedule 40 pvc in its lace and hang via clevis hangers from slab every 6 ft
Kinsey will make access through slab in downstairs master bathroom floor we will tunnel up to 35 ft to gain access to master bathroom shower sinks and toilet along with washing machine line where it ties into main sewer. kinsey will remove and replace all pvc in tunnel roughly 25 ft 3 and 20 ft of 2 pvc with new schedule 40 pvc in its lace and hang via clevis hangers from slab every 6 ft
City of Austin permitPlumbing PermitFinal- Record
- 2024-073518 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Requesting a stand-alone permit to wire a split a/c system
Requesting a stand-alone permit to wire a split a/c system
City of Austin permitElectrical PermitFinal- Record
- 2023-162638 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5709 Painted Valley Dr
What is being built at 5709 Painted Valley Dr?
The latest filing (City of Austin permit 2024-073518 PP, June 14, 2024) covers kinsey will make access through slab in downstairs master bathroom floor we will tunnel up to 35 ft to gain access to master bathroom shower sinks and toilet along with washing machine line where it ties into main sewer. kinsey will remove and replace all pvc in tunnel roughly 25 ft 3 and 20 ft of 2 pvc with new schedule 40 pvc in its lace and hang via clevis hangers from slab every 6 ft.
How many permits and filings does 5709 Painted Valley Dr have?
2 filings across 2 projects, from December 27, 2023 to June 14, 2024.
Is there other construction near 5709 Painted Valley Dr?
Yes. Nearby filings include 5707 Painted Valley Dr (replacement of complete existing central heat and air system with or without duct work, Dec 6, 2024); 5706 Painted Valley Dr (replace existing 150 amp meter and main breaker panel with 200 amp meter with bypass handle and 200 amp main disconnect. install grounding system consisting of 2 ground rods 1 cold water bond and an intersystem bond. install whole home surge protection. replace existing 24 space garage sub panel with modern 24 space main lug sub panel. install new overcurrent devices, Apr 24, 2025); 5703 Painted Valley Dr (replacement of complete existing central heat and air system with or without duct work, Oct 22, 2025).
How do I get alerts for new permits at 5709 Painted Valley Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 5707 Painted Valley DrDec 6, 2024Replacement of complete existing central heat and air system with or without duct work · 30 m away
- 5706 Painted Valley DrApr 24, 2025Replace existing 150 amp meter and main breaker panel with 200 amp meter with bypass handle and 200 amp main disconnect. install grounding system consisting of 2 ground rods 1 cold water bond and an intersystem bond. install whole home surge protection. replace existing 24 space garage sub panel with modern 24 space main lug sub panel. install new overcurrent devices · 81 m away
- 5703 Painted Valley DrOct 22, 2025Replacement of complete existing central heat and air system with or without duct work · 85 m away
- 5704 Painted Valley DrOct 31, 2024Bathroom remodel. moving receptacles. upgrading fixtures to led · 95 m away
- 5701 Painted Valley DrJul 2, 2026Interior remodel of two story residence with three bedrooms: reconfigure bedrooms office laundry bathrooms kitchen and dining. remove 1 bedroom on first floor and add bedroom on second floor. new windows · 110 m away
- 5710 Rain Creek PkwyAug 19, 2024Replacement of an existing water heater · 115 m away
- 5801 Painted Valley DrAug 12, 2025Replacement of complete existing central heat and air system with or without duct work · 117 m away
- 5702 Painted Valley DrNov 10, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 118 m away
- 5716 Painted Valley DrSep 30, 2026Main panel changeout · 123 m away
- 5712 Rain Creek PkwyDec 13, 2023Break out 3 x 3 area of slab in master bathroom to access and repair broken drain line under slab. backfill slab · 126 m away
- 10627 Floral Park DrOct 16, 2025Replacement of complete existing central heat and air system with or without duct work andrea miller - replacing like for like 4t vert gas · 130 m away
- 10639 Floral Park DrFeb 12, 2026Replacement of complete existing central heat and air system with or without duct work installation for replacement of an ac and furnace with coil · 138 m away