Rooftop solar and battery permitted at 6011 Salton Dr

A 12.3-kW rooftop solar system and an 11.5-kW energy storage system were permitted for the existing residence at 6011 Salton Dr. The City of Austin electrical permit, 2025-101764 EP, was filed August 13, 2025, and has final status.

Summarized from City of Austin records · updated Aug 22, 2025

Projects
3
3 filings
Latest filing
Aug 22, 2025
since Aug 13, 2025
Largest scope
—
Listed value
—

Where this project stands

Permit withdrawn

Request to disconnect new 200 amp automatic transfer switch installation on the existing 200 amp panel (span panel) no new meter can is required

  1. AppliedAug 20, 2025
  2. IssuedAug 22, 2025
  3. !WorkAug '25 – Feb '26
  4. Final inspection

Marked withdrawn Sep 9, 2025.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Request to disconnect new 200 amp automatic transfer switch installation on the existing 200 amp panel (span panel) no new meter can is required

    Request to disconnect new 200 amp automatic transfer switch installation on the existing 200 amp panel (span panel) no new meter can is required

    City of Austin permitElectrical PermitWithdrawn
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install new 12.3 kw rooftop solar and 11.5 kw energy storage system to existing residential only

    Install new 12.3 kw rooftop solar and 11.5 kw energy storage system to existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Resubmitted at coa request - changed to upgrade since espa is attached. federal pacific panel replaced and service meter replaced

    Resubmitted at coa request - changed to upgrade since espa is attached. federal pacific panel replaced and service meter replaced

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6011 Salton Dr

What is being installed at 6011 Salton Dr?

A City of Austin permit records a 12.3-kW rooftop solar installation and an 11.5-kW energy storage system for the existing residence.

When was the solar permit filed for 6011 Salton Dr?

Permit 2025-101764 EP was filed August 13, 2025. Its status is final.

Is 6011 Salton Dr a new construction project?

The permit describes the solar and storage installation as work at an existing residence, not new construction.

How large is the solar system at 6011 Salton Dr?

The permit describes a 12.3-kW rooftop solar system.

Is a battery or energy storage system planned for 6011 Salton Dr?

Yes. Permit 2025-101764 EP includes an 11.5-kW energy storage system.

Was an automatic transfer switch permitted at 6011 Salton Dr?

A separate request, permit 2025-105752 EP, concerned disconnecting a new 200-amp automatic transfer switch installation. That permit was withdrawn.

Also being built nearby

All of 78759

More warehouses & industrial in 78759, solar installs in 78759.

Email me when a new permit is filed