6109 Sierra Leon
Austin, TX 78759
6109 Sierra Leon: 2 projects on record
City of Austin lists 2 filings across 2 projects at 6109 Sierra Leon, Austin, TX 78759. The most recent, filed August 8, 2024, covers: “Express - replace 14 windows like for like”.
Compiled from City of Austin records · updated Aug 8, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Aug 8, 2024
- since Aug 8, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress - replace 14 windows like for like
- AppliedJun 20, 2024
- IssuedAug 8, 2024
- WorkAug '24 – Nov '24
- Final inspectionNov 18, 2024
Passed final inspection Nov 18, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
2 projectsExpress - replace 14 windows like for like
Express - replace 14 windows like for like
City of Austin permitBuilding PermitFinal- Record
- 2024-077630 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Panel upgrade from 150 to 200
Panel upgrade from 150 to 200
City of Austin permitElectrical PermitExpired- Record
- 2023-090616 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6109 Sierra Leon
What is being built at 6109 Sierra Leon?
The latest filing (City of Austin permit 2024-077630 BP, August 8, 2024) covers express - replace 14 windows like for like.
How many permits and filings does 6109 Sierra Leon have?
2 filings across 2 projects, from August 8, 2024 to August 8, 2024.
Is there other construction near 6109 Sierra Leon?
Yes. Nearby filings include 6113 Sierra Leon (replacement of complete existing central heat and air system with or without duct work, Jun 24, 2024); 6105 Sierra Leon (replacement of complete existing central heat and air system with or without duct work, Apr 17, 2026); 6110 Sierra Leon (replacement of 2 existing ng water heaters, Mar 25, 2024).
How do I get alerts for new permits at 6109 Sierra Leon?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 6113 Sierra LeonJun 24, 2024Replacement of complete existing central heat and air system with or without duct work · 21 m away
- 6105 Sierra LeonApr 17, 2026Replacement of complete existing central heat and air system with or without duct work · 22 m away
- 6110 Sierra LeonMar 25, 2024Replacement of 2 existing ng water heaters · 44 m away
- 6114 Sierra LeonOct 29, 2025Replacement of an existing water heater · 56 m away
- 6106 Sierra LeonFeb 9, 2026Replacement of an existing water heater 50gal gas tank located above the garage · 56 m away
- 6118 Sierra LeonJun 25, 2026Replacement of complete existing central heat and air system with or without duct work steve shannon · 75 m away
- 11513 Leon Grande CvOct 9, 2026Ev car charger from main panel install adding ground rods and surge protection. no meter work. ae is the electric provider · 96 m away
- 6126 Sierra LeonJul 15, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton gas system · 97 m away
- 6129 Sierra LeonAug 12, 2025Replacement of complete existing central heat and air system with or without duct work · 105 m away
- 11524 Leapwood PlMar 18, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3.5t horizontal gas system (upstairs) · 113 m away
- 11600 Leapwood PlJun 24, 2026Run 60 amp circuit from outdoor main electrical panel back to back into garage and mount customer supplied tesla wall connector. total nec calculated load 148 a. current service size 200 amp · 134 m away
- 11609 Leapwood PlJun 16, 2025Utility disconnect/reconnect. tesla backup switch. underground service. ae. meter can does not need replacing- no espa attached · 148 m away