6402 Amberly Pl

Austin, TX 78759

Permits cover home vehicle-to-home system and EV charger

Austin permits filed September 2 and 12, 2026, cover a vehicle-to-home charging system and a Level 2 EV charger at this home. The work also includes upgrading electrical service to 200 amps and installing new breakers.

Summarized from City of Austin records · updated Sep 12, 2026

Projects
2
2 filings
Latest filing
Sep 12, 2026
since Sep 2, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Temporary outage required to upgrade service to 200a new meter can new 200a breaker governing the service as well as the feeder breaker to the existing main panel and the installation of a level 2 ev charger

  1. AppliedSep 3, 2026
  2. IssuedSep 12, 2026
  3. WorkSep '26 – Oct '26
  4. Final inspectionOct 9, 2026

Passed final inspection Oct 9, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Temporary outage required to upgrade service to 200a new meter can new 200a breaker governing the service as well as the feeder breaker to the existing main panel and the installation of a level 2 ev charger

    Temporary outage required to upgrade service to 200a new meter can new 200a breaker governing the service as well as the feeder breaker to the existing main panel and the installation of a level 2 ev charger

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installation of gm energy v2h (vehicle-to-home) charging system. we are pulling an aux permit because the hardware involves a ul 1741 grid-interactive device. ae will want to test the v2h functionality at final inspection to ensure effective isolation from the grid. designated backed-up loads for v2h during grid outage are listed on the uploaded design. *** called out to customer and advised per ae required to get an additional repair permit for the new breaker added to main panel of the home and new circuits hard wired to the v2h system. solar inspection team will need the car to be present to test the isolation from the grid

    Installation of gm energy v2h (vehicle-to-home) charging system. we are pulling an aux permit because the hardware involves a ul 1741 grid-interactive device. ae will want to test the v2h functionality at final inspection to ensure effective isolation from the grid. designated backed-up loads for v2h during grid outage are listed on the uploaded design. *** called out to customer and advised per ae required to get an additional repair permit for the new breaker added to main panel of the home and new circuits hard wired to the v2h system. solar inspection team will need the car to be present to test the isolation from the grid

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6402 Amberly Pl

What is being installed at 6402 Amberly Pl?

Austin permits describe a vehicle-to-home charging system and a Level 2 EV charger, along with electrical service and breaker upgrades.

Is a vehicle-to-home system being installed at 6402 Amberly Pl?

Yes. Permit 2026-104201 EP, filed September 2, 2026, covers a GM Energy vehicle-to-home system.

Is there a permit for an EV charger at 6402 Amberly Pl?

Yes. Permit 2026-116059 EP, filed September 12, 2026, describes installation of a Level 2 EV charger.

Is the electrical service being upgraded at 6402 Amberly Pl?

Yes. The September 12, 2026, permit describes an upgrade to 200-amp service, including a new meter can and breakers.

When were the permits filed for 6402 Amberly Pl?

The two Austin electrical permits were filed September 2 and September 12, 2026. Both are listed as final.