6415 Yaupon Dr
Austin, TX 78759
6415 Yaupon Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 6415 Yaupon Dr, Austin, TX 78759. The most recent, filed June 26, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jun 26, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 26, 2025
- since Jun 26, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJun 18, 2025
- IssuedJun 26, 2025
- WorkJun '25 – Dec '25
- Final inspectionJul 29, 2025
Passed final inspection Jul 29, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-076307 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6415 Yaupon Dr
What is being built at 6415 Yaupon Dr?
The latest filing (City of Austin permit 2025-076307 MP, June 26, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 6415 Yaupon Dr have?
1 filing across 1 project, from June 26, 2025 to June 26, 2025.
Is there other construction near 6415 Yaupon Dr?
Yes. Nearby filings include 6413 Yaupon Dr (install level 2 ev charger, Oct 26, 2026); 6411 Yaupon Dr (replacement of complete existing central heat and air system with or without duct work, Mar 15, 2024); 6409 Yaupon Dr (replacement of complete existing central heat and air system with or without duct work 2.5 ton horiz (lp) gas with extras 2.5 ton horiz (lp) gas with extras, Dec 6, 2024).
How do I get alerts for new permits at 6415 Yaupon Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 6413 Yaupon DrOct 26, 2026Install level 2 ev charger · 19 m away
- 6411 Yaupon DrMar 15, 2024Replacement of complete existing central heat and air system with or without duct work · 40 m away
- 6409 Yaupon DrDec 6, 2024Replacement of complete existing central heat and air system with or without duct work 2.5 ton horiz (lp) gas with extras 2.5 ton horiz (lp) gas with extras · 65 m away
- 6410 Yaupon DrOct 28, 2026Base: installing a backup battery system and additional meter socket · 76 m away
- 6429 Yaupon DrMay 15, 2024Replacement of complete existing central heat and air system with or without duct work · 136 m away
- 6431 Yaupon DrSep 20, 2024Replacement of an existing water heater · 156 m away
- 6405 Copperlily CvApr 22, 2026Replacement of complete existing central heat and air system with or without duct work · 168 m away
- 6403 Copperlily CvJul 3, 2025Replacement of complete existing central heat and air system with or without duct work · 189 m away
- 6335 Yaupon DrApr 24, 2025Express: replace 9 windows (like for like) · 199 m away
- 6401 Copperlily CvNov 28, 2023Replacement of complete existing central heat and air system with or without duct work · 215 m away
- 6304 Duranta CvFeb 13, 2025Request to disconnect. install tesla backup switch. underground. ae. meter can does not need replacing · 219 m away
- 6402 Copperlily CvApr 11, 2024Electrical connection from house to new backyard shed as an office space via sub panel. the office will consist of electrical outlets and lights. shed is 192 square feet · 228 m away