6709 Zenith Cv
Austin, TX 78759
Two HVAC system replacements permitted at 6709 Zenith Cv
Austin permits show two replacements of the home’s existing central heating and air system: one filed November 27, 2023, and another filed October 2, 2025. Both mechanical permits are marked final.
Summarized from City of Austin records · updated Oct 2, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 2, 2025
- since Nov 27, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work like for like: 3 ton two stage horizontal gas system
- AppliedSep 26, 2025
- IssuedOct 2, 2025
- WorkOct '25 – Nov '25
- Final inspectionNov 5, 2025
Passed final inspection Nov 5, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work like for like: 3 ton two stage horizontal gas system
Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton two stage horizontal gas system
City of Austin permitMechanical PermitFinal- Record
- 2025-123084 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system without duct work
Replacement of complete existing central heat and air system without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-151646 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6709 Zenith Cv
What work was permitted at 6709 Zenith Cv in Austin?
City of Austin records show two permits for replacement of the home’s existing central heating and air system. Both are mechanical permits marked final.
Was a new home permitted at 6709 Zenith Cv?
The records provided show mechanical permits for HVAC system replacements, not a permit for a new home.
When was the latest permit filed for 6709 Zenith Cv?
The latest filing was October 2, 2025, under permit 2025-123084 MP. It covers replacement of the existing central heat and air system.
What does permit 2025-123084 MP cover?
It covers replacement of the complete existing central heat and air system, with or without duct work, with a like-for-like 3-ton, two-stage horizontal gas system. The permit is marked final.
Was there an earlier HVAC permit at 6709 Zenith Cv?
Yes. Permit 2023-151646 MP was filed November 27, 2023, for replacement of the complete existing central heat and air system without duct work. It is marked final.
Also being built nearby
All of 78759- 6704 Zenith CvMay 29, 2024Addition of 2nd-floor office with covered patio below; demolition existing back patio; fire separation for existing garage · 49 m away
- 6705 Zenith CvNov 21, 2024Change-out water heater to exist residence only · 50 m away
- 6703 Zenith CvSep 17, 2026Replacing ae meter can and 200a outdoor panel · 70 m away
- 10608 Zeus CvOct 27, 2025Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 10607 Zeus CvJun 23, 2026New uncovered wood deck (pool permitted separate) · 104 m away
- 6803 Manzanita StMay 11, 2026Gfci near water heater · 107 m away
- 6615 Manzanita StApr 4, 2024Install new gas line from meter to generator · 112 m away
- 10800 Catthorn CvAug 7, 2024Tunnel 10 feet under the house with access behind the affected shower and engineers letter for secure foundation · 130 m away
- 10705 Buckthorn DrDec 28, 2023Express: tub to shower conversion (replace existing tub/shower with prefab shower base replace walls with prefab acrylic walls replace valve with valve replace shower head) · 132 m away
- 10606 Zeus CvJun 3, 2026*emergency* rebuild electrical service underground. austin energy has already disconnected power from the house · 133 m away
- 6621 Lost Horizon DrJul 17, 2024Replacement of complete existing central heat and air system with or without duct work · 133 m away
- 10703 Buckthorn DrJun 9, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 3.5-ton vertical gas hvac system with like-for-like changeout/alteration · 134 m away