6804 Township Trl
Austin, TX 78759
6804 Township Trl: 1 project on record
City of Austin lists 1 filing across 1 project at 6804 Township Trl, Austin, TX 78759. The most recent, filed July 18, 2024, covers: “Install of power for ev charger”.
Compiled from City of Austin records · updated Jul 18, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 18, 2024
- since Jul 18, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall of power for ev charger
- AppliedJul 17, 2024
- IssuedJul 18, 2024
- WorkJul '24 – Jan '25
- Final inspectionJul 19, 2024
Passed final inspection Jul 19, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall of power for ev charger
Install of power for ev charger
City of Austin permitElectrical PermitFinal- Record
- 2024-088383 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6804 Township Trl
What is being built at 6804 Township Trl?
The latest filing (City of Austin permit 2024-088383 EP, July 18, 2024) covers install of power for ev charger.
How many permits and filings does 6804 Township Trl have?
1 filing across 1 project, from July 18, 2024 to July 18, 2024.
Is there other construction near 6804 Township Trl?
Yes. Nearby filings include 11105 Oak View Dr (replace 9 windows like for like, Aug 28, 2025); 6800 Township Trl (replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical 2 stage gas system, Sep 8, 2025); 6801 Township Trl (replacement of complete existing central heat and air system with or without duct work like for like: 5 ton 2 stage vertical gas system, Jul 16, 2026).
How do I get alerts for new permits at 6804 Township Trl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 11105 Oak View DrAug 28, 2025Replace 9 windows like for like · 47 m away
- 6800 Township TrlSep 8, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical 2 stage gas system · 49 m away
- 6801 Township TrlJul 16, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton 2 stage vertical gas system · 62 m away
- 6901 Narrow Oak TrlDec 11, 2024Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 6707 Colina LnAug 19, 2025Replacement of an existing water heater · 114 m away
- 6710 Township TrlFeb 16, 2026New construction & addition - garage conversion into bedroom on first floor with an addition of an office space above the existing garage · 116 m away
- 11101 Township CvNov 8, 2025Adding a solar pv rooftop system to an existing residence · 122 m away
- 11202 Oak View DrApr 25, 2024Upgrading existing electrical service from 100a to 200a · 147 m away
- 6703 Colina LnJul 19, 2024Installed gas line for generator · 155 m away
- 11207 Oak View DrMay 12, 2025Replacing 3/4 or 1 prv easy access · 159 m away
- 11107 Township CvOct 23, 2025Express- remove and replace 2 windows- like for like · 166 m away
- 11204 Oak View DrFeb 14, 2024Replacement of complete existing central heat and air system with or without duct work · 169 m away