8503 Alverstone Way
Austin, TX 78759
Electrical panel replacement and EV charging circuit permitted
An electrical permit covers replacement of the 200-amp main service panel and installation of a 60-amp EV charging circuit at 8503 Alverstone Way. The City of Austin record, permit 2026-007562 EP, was filed January 27, 2026, and is marked Final.
Summarized from City of Austin records · updated Jan 27, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 27, 2026
- since Jan 27, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRequest to disconnect - replace 200a main service panel - install 60a ev charging circuit
- AppliedJan 21, 2026
- IssuedJan 27, 2026
- WorkJan '26 – Mar '26
- Final inspectionMar 26, 2026
Passed final inspection Mar 26, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectRequest to disconnect - replace 200a main service panel - install 60a ev charging circuit
Request to disconnect - replace 200a main service panel - install 60a ev charging circuit
City of Austin permitElectrical PermitFinal- Record
- 2026-007562 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8503 Alverstone Way
What is being built at 8503 Alverstone Way?
A City of Austin electrical permit covers replacing the 200-amp main service panel and installing a 60-amp EV charging circuit. It was filed January 27, 2026, under permit 2026-007562 EP.
Is an EV charger being installed at 8503 Alverstone Way?
The permit description lists installation of a 60-amp EV charging circuit. It does not specify installation of a charging unit.
Is a new home being built at 8503 Alverstone Way?
The available record is for electrical work: a main service panel replacement and an EV charging circuit. It does not describe construction of a new home.
When was the electrical permit filed for 8503 Alverstone Way?
The City of Austin permit was filed January 27, 2026. Its record status is Final.
What is permit 2026-007562 EP for in Austin?
Permit 2026-007562 EP covers replacement of a 200-amp main service panel and installation of a 60-amp EV charging circuit at 8503 Alverstone Way. The permit was filed January 27, 2026.
Also being built nearby
All of 78759- 8501 Alverstone WayJun 30, 2026Interior remodel remodel of kitchen breakfast laundry dining and living rooms new flooring in family room entry and hallways · 26 m away
- 8507 Alverstone WayDec 30, 2024Replace meter and panel due to being a federal pacific and being unsafe · 50 m away
- 8507 Adirondack TrlFeb 26, 2025(tadema nathan)- installation of circuit for elec. vehicle charging station - esip · 53 m away
- 8509 Alverstone WayJan 19, 2026Replacement of any existing gas appliance · 72 m away
- 8511 Adirondack TrlNov 6, 2026*partial demolition* interior remodel · 79 m away
- 8504 Adirondack TrlSep 23, 2026Repair the water line 121sqft of sheetrock will be removed · 88 m away
- 8512 Adirondack TrlMay 11, 2026*partial demolition* interior remodel of two-story sfr · 101 m away
- 8509 Appalachian DrApr 26, 2024Repair wooden deck (structural work) replaced rotten corner post · 114 m away
- 8427 Adirondack TrlNov 5, 2025Add to enlarge master suite enclosed pier & beam area to create gameroom with closet relocate wd deck · 118 m away
- 8406 Appalachian DrMay 30, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - like for like. replace current system with new 4 ton multi-stage trane system · 139 m away
- 8425 Adirondack TrlJan 7, 2025Construct new driveway approach of 18 ft and sidewalk of 66 lf · 141 m away
- 8600 Alverstone WayDec 2, 2025Replacement of complete existing central heat and air system with or without duct work · 141 m away