8605 Honeysuckle Trl
Austin, TX 78759
Heat pump and air handler replacement at 8605 Honeysuckle Trl
A like-for-like replacement of the existing central heating and air system at 8605 Honeysuckle Trl includes a 3-ton heat pump and air handler, with or without duct work. The City of Austin issued mechanical permit 2026-076587 MP on June 18, 2026; its status is Final.
Summarized from City of Austin records · updated Jun 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 18, 2026
- since Jun 18, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work hvac changeout/alteration: replace and install 3 ton heat pump and air handler like-for-like no structural change
- AppliedJun 16, 2026
- IssuedJun 18, 2026
- WorkJun '26 – Jun '26
- Final inspectionJun 30, 2026
Passed final inspection Jun 30, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work hvac changeout/alteration: replace and install 3 ton heat pump and air handler like-for-like no structural change
Replacement of complete existing central heat and air system with or without duct work hvac changeout/alteration: replace and install 3 ton heat pump and air handler like-for-like no structural change
City of Austin permitMechanical PermitFinal- Record
- 2026-076587 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8605 Honeysuckle Trl
What is being built at 8605 Honeysuckle Trl?
The permit covers a like-for-like replacement of the existing central heating and air system, including a 3-ton heat pump and air handler. City of Austin permit 2026-076587 MP was filed June 18, 2026.
Is there new construction at 8605 Honeysuckle Trl?
The permit describes replacement of the existing HVAC system, with or without duct work, and says there will be no structural change. It does not describe a new building.
When was the HVAC permit filed for 8605 Honeysuckle Trl?
The City of Austin filed mechanical permit 2026-076587 MP on June 18, 2026. The permit status is Final.
What kind of heat pump is being installed at 8605 Honeysuckle Trl?
The permit specifies a 3-ton heat pump and air handler as a like-for-like replacement for the existing central heating and air system.
Does the work at 8605 Honeysuckle Trl include duct work?
The permit describes the HVAC changeout as being with or without duct work, but does not specify whether duct work will be replaced.
Also being built nearby
All of 78759- 8603 Honeysuckle TrlAug 21, 2025Level 2 ev charger powered by a 60amp circuit breaker at 40amp constant draw · 9 m away
- 8611 Honeysuckle TrlJul 30, 2025*partial demolition* addition/remodel to existing two-story single family residential to include: addition of kitchen dining room & rear trellis on 1st floor; new primary bath & closet expand bdrm 4 on 2nd floor. interior remodel to include: kitchen bathroom utility room & garage conversion to guest bedroom and hallway; 2nd floor ir to include: primary bath closet bedroom & closet and utility room · 61 m away
- 8524 Etienne CvOct 28, 2026Replacement of an existing water heater tankless water heater change out 8524 etienne cove austin tx 78759 · 78 m away
- 8610 Willowick DrJun 5, 2024Replacement of complete existing central heat and air system with or without duct work · 82 m away
- 3708 Cima SerenaSep 12, 2014Cima homes construction plans · 82 m away
- 8613 Honeysuckle TrlAug 4, 2025Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 3706 Cima SerenaNov 17, 2026Base: installing a backup battery system and additional meter socket · 90 m away
- 8425 Etienne CvMar 16, 2026Express: replace 6 windows (like for like) · 93 m away
- 8520 Etienne CvMay 21, 2026Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 8618 Willowick DrNov 3, 2025Install electrical mast that is through the roof on the side of the garage where the existing meter can is located install new meter can install new outdoor panel with main breaker · 95 m away
- 3718 Cima SerenaNov 9, 2026Replacement of complete existing central heat and air system with or without duct work · 107 m away
- 8612 Honeysuckle TrlMar 31, 2025Replace cast iron drain lines by way of tunneling (2) bathrooms kitchen and laundry · 111 m away