8704 Tallwood Dr
Austin, TX 78759
8704 Tallwood Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 8704 Tallwood Dr, Austin, TX 78759 since April 16, 2024. The most recent, filed April 22, 2024, covers: “Install transfer switch and generator”.
Compiled from City of Austin records · updated Apr 22, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Apr 22, 2024
- since Apr 16, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall transfer switch and generator
- AppliedApr 15, 2024
- IssuedApr 22, 2024
- WorkApr '24 – Oct '24
- Final inspectionOct 3, 2024
Passed final inspection Oct 3, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall transfer switch and generator
Install transfer switch and generator
City of Austin permitElectrical PermitFinal- Record
- 2024-046610 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Gasline for generac generator 22kw
Gasline for generac generator 22kw
City of Austin permitPlumbing PermitFinal- Record
- 2024-045692 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8704 Tallwood Dr
What is being built at 8704 Tallwood Dr?
The latest filing (City of Austin permit 2024-046610 EP, April 22, 2024) covers install transfer switch and generator.
How many permits and filings does 8704 Tallwood Dr have?
2 filings across 2 projects, from April 16, 2024 to April 22, 2024.
Is there other construction near 8704 Tallwood Dr?
Yes. Nearby filings include 8700 Tallwood Dr (26kw whole home generator (natural gas) connected to house meter and main panel. ae disconnect required. (sam ponedal), Sep 23, 2024); 8705 Tallwood Dr (tunneling under the foundation to replace cast iron drain lines with sch 40 pvc that supplies (2) bathrooms (1) kitchen and laundry room, Aug 12, 2024); 3902 Greenmountain Ln (replacement of complete existing central heat and air system with or without duct work, Mar 30, 2026).
How do I get alerts for new permits at 8704 Tallwood Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 8700 Tallwood DrSep 23, 202426kw whole home generator (natural gas) connected to house meter and main panel. ae disconnect required. (sam ponedal) · 43 m away
- 8705 Tallwood DrAug 12, 2024Tunneling under the foundation to replace cast iron drain lines with sch 40 pvc that supplies (2) bathrooms (1) kitchen and laundry room · 44 m away
- 3902 Greenmountain LnMar 30, 2026Replacement of complete existing central heat and air system with or without duct work · 66 m away
- 3904 Greenmountain LnMar 5, 2026Replacing hvac to existing residence only **paula barnett: replacement of 4t vertical like-for-like gas system · 69 m away
- 3905 Hyridge DrJul 15, 2024Express remove & replace 1 window like for like · 81 m away
- 3907 Greenmountain LnDec 5, 2025Addition / remodel of existing 1 story sfr · 82 m away
- 8702 Mountainwood CirDec 12, 2025Replacement of an existing water heater exchanging like for like gas tank water heater in the garage · 95 m away
- 8614 Tallwood DrOct 17, 2024Tunnel under the foundation and replace cast iron drain line in (2) bathroom (1) kitchen and (1) laundry with pvc · 104 m away
- 4004 Hyridge DrAug 28, 2026Complete upstairs renovation of existing gypsum wallboard as needed to access damaged areas and facilitate repairs. the existing shower pan will be removed and replaced and any water-damaged or deteriorated wood framing and sub flooring in the surrounding walls and floor system · 124 m away
- 8713 Tallwood DrNov 21, 2025Rebuild existing service existing service has no main disconnect and has old federal breakers · 125 m away
- 8712 Tallwood DrFeb 6, 2025Install level 2 ev charger · 127 m away
- 8708 Mountainwood CirAug 19, 2025This project is an interior remodel of an existing one-story residence which includes removing a load-bearing wall in the living area vaulting the living area ceiling and adjusting the hvac layout. there will also be a new kitchen island and cabinets new plumbing locations in the primary bathroom and will include replacing the exterior doors and the existing flooring in the living area · 127 m away