A plumbing permit filed August 14, 2026, covers cutting a 3-by-3-foot access opening in the garage slab to replace a running trap beneath it. The City of Austin lists the permit, 2026-094398 PP, as active.
Summarized from City of Austin records · updated Aug 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 14, 2026
- since Aug 14, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwaySlab penetration in garage to replace running trap under slab. 3x3 access hole
- AppliedJul 22, 2026
- IssuedAug 14, 2026
- WorkAug '26 – Feb '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectSlab penetration in garage to replace running trap under slab. 3x3 access hole
Slab penetration in garage to replace running trap under slab. 3x3 access hole
City of Austin permitPlumbing PermitActive- Record
- 2026-094398 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8721 Tallwood Dr
What work is happening at 8721 Tallwood Dr?
A City of Austin plumbing permit covers an access opening in the garage slab to replace a running trap underneath. The permit was filed August 14, 2026.
What is permit 2026-094398 PP for?
Permit 2026-094398 PP covers a 3-by-3-foot access hole in the garage slab to replace a running trap beneath it.
When was the plumbing permit filed at 8721 Tallwood Dr?
The permit was filed on August 14, 2026, and is listed as active by the City of Austin.
Is a new house being built at 8721 Tallwood Dr?
The available permit is for plumbing work to replace a running trap under the garage slab; it does not describe construction of a new house.
Does the permit include a project cost or square footage?
The available record does not list a project cost or square footage.
Also being built nearby
All of 78759- 8710 Oakmountain CirSep 26, 2025New 1-story 4 bedroom 3.5 bathroom single family residence with attached garage and covered porches/decks · 45 m away
- 3901 Silverspring DrApr 4, 2025Express: tub shower combination to tub shower combination not moving plumbing not changing layout all work done in the wet area for plumbing. electrical will be changing out light fixture to can lights and also adding a light switch · 65 m away
- 8715 Tallwood DrMay 5, 2025Tunnel under the foundation and replace cast iron drain lines at the kitchen laundry and bathroom. tunnel 90 lf and replace 90 lf of drain lines. no sheetrock removal. kitchen bathroom and laundry: access holes are outside at each location · 74 m away
- 8724 Tallwood DrMar 11, 2024Replacement of complete existing central heat and air system with or without duct work · 86 m away
- 8727 Tallwood DrJul 25, 2024Replace cast iron drain lines under house and sewer yard line with pvc pipes · 89 m away
- 8706 Oakmountain CirOct 24, 20245 tunnel job to perform drain rebuild with pvc. drain rebuild requiring tunneling to get underneath the home to repair the drain. the tunnel is roughly 5 feet so that we may perform a 4 repair. no tunnel plumber tied in to kitchen sink and ran 2 to building sewer tie in · 93 m away
- 8725 Silverhill LnApr 22, 2026Replacement of an existing water heater · 105 m away
- 8801 Tallwood DrMay 23, 2025Express: replace 8 windows (like for like) unit a only · 108 m away
- 8713 Tallwood DrNov 21, 2025Rebuild existing service existing service has no main disconnect and has old federal breakers · 108 m away
- 8710 Mountainwood CirMay 28, 2026Replacement of complete existing central heat and air system with or without duct work · 110 m away
- 8726 Tallwood DrJun 30, 2026Install homebuilders loop ref: 2026-039967-bp · 115 m away
- 8712 Tallwood DrFeb 6, 2025Install level 2 ev charger · 116 m away