8807 Ridgehill Dr
Austin, TX 78759
8807 Ridgehill Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 8807 Ridgehill Dr, Austin, TX 78759 since March 1, 2024. The most recent, filed November 8, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Nov 8, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Nov 8, 2024
- since Mar 1, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedNov 1, 2024
- IssuedNov 8, 2024
- WorkNov '24 – Jan '25
- Final inspectionJan 21, 2025
Passed final inspection Jan 21, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-146704 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: window replacement (like for like)
Express: window replacement (like for like)
City of Austin permitBuilding PermitFinal- Record
- 2024-024857 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8807 Ridgehill Dr
What is being built at 8807 Ridgehill Dr?
The latest filing (City of Austin permit 2024-146704 MP, November 8, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 8807 Ridgehill Dr have?
2 filings across 2 projects, from March 1, 2024 to November 8, 2024.
Is there other construction near 8807 Ridgehill Dr?
Yes. Nearby filings include 8803 Ridgehill Dr (express: partial home remodel. no structural plumbing or exterior/site work proposed. no change in layout. new electrical service and partial electrical rewiring and new lighting. new wired smoke and carbon monoxide detectors. new wall and ceiling insulation and new hvac ducts meeting. replacing two bathroom exhaust fans. new drywall, Jul 24, 2025); 8806 Ridgehill Dr (express: replace 10 windows existing windows of the same size like for like, Jul 1, 2026); 8802 Silverwood Ct (express - replace10 existing windows size for size, Nov 3, 2025).
How do I get alerts for new permits at 8807 Ridgehill Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 8803 Ridgehill DrJul 24, 2025Express: partial home remodel. no structural plumbing or exterior/site work proposed. no change in layout. new electrical service and partial electrical rewiring and new lighting. new wired smoke and carbon monoxide detectors. new wall and ceiling insulation and new hvac ducts meeting. replacing two bathroom exhaust fans. new drywall · 51 m away
- 8806 Ridgehill DrJul 1, 2026Express: replace 10 windows existing windows of the same size like for like · 57 m away
- 8802 Silverwood CtNov 3, 2025Express - replace10 existing windows size for size · 60 m away
- 8801 Ridgehill DrJan 31, 2025Replacement of complete existing central heat and air system with or without duct work located in garage · 75 m away
- 8808 Mesa DrJan 19, 2026Ev charger · 80 m away
- 4008 Silverspring DrJan 3, 2025Main service replacement · 81 m away
- 8702 Silverhill LnDec 30, 2025Tunnel under house and repair drain line system **tunnel approximately 90 linear feet underneath home and replace all the cast iron drain lines under the home · 101 m away
- 8811 Point West DrJul 24, 2026Install level 2 ev charger · 106 m away
- 8903 Split Oak CirMay 15, 2024Repairing meter riser including conduit going through the roof and the wire from meter to weatherhead · 111 m away
- 8716 Ridgehill DrNov 10, 2026Replace cast iron drain lines with pvc material for primary bathroom and hall bathroom with kitchen and washer drain line. total length of tunnel is approximately 110 feet from right side of the home to the left side and route drain line to the left side of the garage. sewer line will be replaced from the home to the city tap connection total length of sewer line is approximately 50 feet · 116 m away
- 8705 Silverhill LnNov 10, 2026Construct new driveway approach 19 ft. fee in lieu of sidewalk paid · 142 m away
- 8910 Currywood DrJul 29, 2026Install hardwire electric vehicle charger. emt conduit installed from main panel to garage · 148 m away