8847 Honeysuckle Trl
Austin, TX 78759
8847 Honeysuckle Trl: 2 projects on record
City of Austin lists 2 filings across 2 projects at 8847 Honeysuckle Trl, Austin, TX 78759. The most recent, filed November 18, 2026, covers: “Replacement of complete existing central heat and air system with or without duct work hvac changeout/alteration: replace existing 2.5-ton split heat-pump system”.
Compiled from City of Austin records · updated Nov 18, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 18, 2026
- since Nov 18, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReplacement of complete existing central heat and air system with or without duct work hvac changeout/alteration: replace existing 2.5-ton split heat-pump system
- AppliedNov 11, 2026
- IssuedNov 18, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work hvac changeout/alteration: replace existing 2.5-ton split heat-pump system
Replacement of complete existing central heat and air system with or without duct work hvac changeout/alteration: replace existing 2.5-ton split heat-pump system
City of Austin permitMechanical PermitActive- Record
- 2026-148717 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2023-115025 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8847 Honeysuckle Trl
What is being built at 8847 Honeysuckle Trl?
The latest filing (City of Austin permit 2026-148717 MP, November 18, 2026) covers replacement of complete existing central heat and air system with or without duct work hvac changeout/alteration: replace existing 2.5-ton split heat-pump system.
How many permits and filings does 8847 Honeysuckle Trl have?
2 filings across 2 projects, from November 18, 2026 to November 18, 2026.
Is there other construction near 8847 Honeysuckle Trl?
Yes. Nearby filings include 8837 Honeysuckle Trl (convert existing townhouse attic space into an office. remodel an existing bedroom and closet to make room for a staircase up to the attic. this home is a townhouse connected to 3 other townhomes. there is no change to the lot building coverage or impervious cover with this townhouse attic conversion, Oct 18, 2026); 8831 Honeysuckle Trl (replacement of an existing water heater 50gal electric located in a closet, Aug 25, 2026); 9077 Jollyville Rd (jollyville office, Mar 2, 2007).
How do I get alerts for new permits at 8847 Honeysuckle Trl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 8837 Honeysuckle TrlOct 18, 2026Convert existing townhouse attic space into an office. remodel an existing bedroom and closet to make room for a staircase up to the attic. this home is a townhouse connected to 3 other townhomes. there is no change to the lot building coverage or impervious cover with this townhouse attic conversion · 48 m away
- 8831 Honeysuckle TrlAug 25, 2026Replacement of an existing water heater 50gal electric located in a closet · 74 m away
- 9077 Jollyville RdMar 2, 2007Jollyville office · 83 m away
- 8827 Honeysuckle TrlApr 22, 2025Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 8812 Tallwood DrSep 8, 2026Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 8825 Honeysuckle TrlFeb 11, 2026Express- replace windows same size and same location. remove and replace siding (appx 100 sq ft). remove/repair drywall (appx 50 sq ft) and replace insulation as needed. no change to floor plan no added openings · 97 m away
- 9300 Research Blvd Svrd SbNov 19, 20241664-moontower-mbuilders: st.1: install (1) set illuminated channel letters on backer cabinet north elev · 100 m away
- 8814 Silverarrow CirMar 14, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds in front back and the side of the house · 105 m away
- 8824 Honeysuckle TrlApr 10, 2024Express: new kitchen cabinets keep the same layout new flooring new countertop new baseboards new trim remove all popcorn texture from walls and ceilings new sanded texture paint all interior wood and walls new epoxy flooring · 105 m away
- 8808 Tallwood DrSep 8, 2026Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 8809 Silverarrow CirMay 17, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds in front back and the side of the house · 138 m away
- 8814 Honeysuckle TrlJul 9, 2025Interior remodel to kitchen and 2 bathrooms adding to existing covered patio updating electric breaker panel · 141 m away