9100 Rockcrest Cir
Austin, TX 78759
9100 Rockcrest Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 9100 Rockcrest Cir, Austin, TX 78759. The most recent, filed January 9, 2024, covers: “*request to disconnect* installation of a new generac 24kw backup generator and 200 amp se rated automatic transfer switch for home residence power backup. generator will be installed on new 3 composite concrete pad. customer installed new natural gas line from meter to new generator. automatic transfer switch will be connected to existing 200a main electrical panel and new generator disconnect / reconnect”.
Compiled from City of Austin records · updated Jan 9, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 9, 2024
- since Jan 9, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled*request to disconnect* installation of a new generac 24kw backup generator and 200 amp se rated automatic transfer switch for home residence power backup. generator will be installed on new 3 composite concrete pad. customer installed new natural gas line from meter to new generator. automatic transfer switch will be connected to existing 200a main electrical panel and new generator disconnect / reconnect
- AppliedJan 8, 2024
- IssuedJan 9, 2024
- WorkJan '24 – Jan '24
- Final inspectionFeb 2, 2024
Passed final inspection Feb 2, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 project*request to disconnect* installation of a new generac 24kw backup generator and 200 amp se rated automatic transfer switch for home residence power backup. generator will be installed on new 3 composite concrete pad. customer installed new natural gas line from meter to new generator. automatic transfer switch will be connected to existing 200a main electrical panel and new generator disconnect / reconnect
*request to disconnect* installation of a new generac 24kw backup generator and 200 amp se rated automatic transfer switch for home residence power backup. generator will be installed on new 3 composite concrete pad. customer installed new natural gas line from meter to new generator. automatic transfer switch will be connected to existing 200a main electrical panel and new generator disconnect / reconnect
City of Austin permitElectrical PermitFinal- Record
- 2024-002189 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9100 Rockcrest Cir
What is being built at 9100 Rockcrest Cir?
The latest filing (City of Austin permit 2024-002189 EP, January 9, 2024) covers *request to disconnect* installation of a new generac 24kw backup generator and 200 amp se rated automatic transfer switch for home residence power backup. generator will be installed on new 3 composite concrete pad. customer installed new natural gas line from meter to new generator. automatic transfer switch will be connected to existing 200a main electrical panel and new generator disconnect / reconnect.
How many permits and filings does 9100 Rockcrest Cir have?
1 filing across 1 project, from January 9, 2024 to January 9, 2024.
Is there other construction near 9100 Rockcrest Cir?
Yes. Nearby filings include 4104 Bluffridge Dr (replace sewer yard line from house connection to city tap, May 6, 2024); 9101 Rockcrest Cir (replace sewer yard line from house connection to city tap, May 25, 2024); 9008 Rockcrest Dr (install level 2 ev charger, May 22, 2026).
How do I get alerts for new permits at 9100 Rockcrest Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 4104 Bluffridge DrMay 6, 2024Replace sewer yard line from house connection to city tap · 34 m away
- 9101 Rockcrest CirMay 25, 2024Replace sewer yard line from house connection to city tap · 44 m away
- 9008 Rockcrest DrMay 22, 2026Install level 2 ev charger · 56 m away
- 9106 Rockcrest CirNov 25, 2024We will be rebuilding the service for a duplex unit that is not up to code that had fallen down in a storm. the service looks to be 200a spiced at the weather head splitting it to two 100a services per each duplex. once we rebuild the service we will be moving this splice to a wire gutter mounted on the wall above the two meter cans. we will be also replacing the meter bases and 100a panels · 60 m away
- 4110 Bluffridge DrSep 18, 2026Replacement of complete existing central heat and air system with or without duct work · 60 m away
- 9009 Rockcrest DrMar 11, 2025In-ground gunite pool and concrete decking · 74 m away
- 4111 Bluffridge DrApr 15, 2024Replacement of an existing water heater · 82 m away
- 4112 Bluffridge DrOct 11, 2024Addition/remodel. addition of an accessory apartment consisting of 1 bedroom 1 bathroom and living area with kitchen above the garage. accessory apartment will have separate access via an exterior staircase and covered screened porch · 85 m away
- 9006 Rockcrest DrMay 30, 2024Replace sewer yard line from house connection to city tap · 86 m away
- 9005 Rockcrest DrJun 17, 2025Interior remodel - moving interior walls to open a room - replacing existing beam and load bearing wall demolition existing attached covered front porch · 117 m away
- 4002 Bluffridge CirDec 12, 2024Interior remodel including kitchen and bathroom upgrades and modifications to primary bathroom. plumbing and electrical layout modifications · 139 m away
- 4201 Cliffwood CvJun 21, 2024New pool (with heater or autofill) required enclosure elevated patio space and pool deck · 141 m away