groundranger
Active · latest filing Oct 2026Commercial

9700 Stonelake Blvd

Austin, TX 78759 · Gateway Square, LLC

Movie theater remodel and pipe replacement at 9700 Stonelake Blvd

Permits indicate a phased remodel of an existing movie theater at 9700 Stonelake Blvd, with phase work recorded from 2025 and a lobby revision filed July 16, 2025. A plumbing permit filed October 30, 2026, covers replacing old cast-iron piping beneath the property.

Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Oct 30, 2026

Projects
15
15 filings
Latest filing
Oct 30, 2026
since Dec 8, 2008
Largest scope
41,300 sf
Estimated cost
$2.0M
state registration

Where this project stands

Permit active · work underway

183 tunnel with 64 trench approx 7 deep through concrete to replace old cast iron piping under the property

  1. AppliedOct 27, 2026
  2. IssuedOct 30, 2026
  3. WorkOct '26 – Apr '27
  4. Final inspection
11% through of the permit windowOct 30, 2026 → Apr 28, 2027

1 contact on this project · 1 phone number

Permit & project history

15 projects
  1. 183 tunnel with 64 trench approx 7 deep through concrete to replace old cast iron piping under the property

    183 tunnel with 64 trench approx 7 deep through concrete to replace old cast iron piping under the property

    City of Austin permitPlumbing PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Revision to 2024-103484 pr to add phase 5. remodel to lobby changing finishes refurbish millwork and wall finishes at concession stand self serve ticket kiosk and signage. verify no mechanical work being performed

    Revision to 2024-103484 pr to add phase 5. remodel to lobby changing finishes refurbish millwork and wall finishes at concession stand self serve ticket kiosk and signage. verify no mechanical work being performed

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Revision to 2024-103484 pr to add phase 5. remodel to lobby changing finishes refurbish millwork and wall finishes at concession stand self serve ticket kiosk and signage. verify no mechanical work being performed

    Revision to 2024-103484 pr to add phase 5. remodel to lobby changing finishes refurbish millwork and wall finishes at concession stand self serve ticket kiosk and signage. verify no mechanical work being performed

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 4 - 11200 sq ft

    Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 4 - 11200 sq ft

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 4 - 11200 sq ft

    Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 4 - 11200 sq ft

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 2 - 14455 sq ft

    Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 2 - 14455 sq ft

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 3 - 9450 sq ft

    Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 3 - 9450 sq ft

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 1 - 9450 sq ft

    Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 1 - 9450 sq ft

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 3 - 9450 sq ft

    Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 3 - 9450 sq ft

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 2 - 14455 sq ft

    Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 2 - 14455 sq ft

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 4 - 11200 sq ft

    Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 4 - 11200 sq ft

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  12. Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 1 - 9450 sq ft

    Remodel to existing movie theater. work to be split into 4 phases in order for the theater to remain in operation. no main means of egress in the building to be blocked. no work to be done to lobby or concessions. phase 1 - 9450 sq ft

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  13. Install new seating — regal gateway 16 theater

    TDLR project registrationRenovation/AlterationProject Registered41,300 sq ft$2.0M est.
    Tenant / owner
    Regal Gateway 16 Theater
    Design firm
    Pro
    Contact
    Pro
  14. Removing a small leaking floor mounted grease trap and replacing with coa approved 100# grease trap mounted within floor/slab

    Removing a small leaking floor mounted grease trap and replacing with coa approved 100# grease trap mounted within floor/slab

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  15. STONEBRIDGE III, RESUBDIVISION OF

    Stonebridge iii resubdivision

    City of Austin casesubdivisionApproved
    Record
    103302
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin · Texas Department of Licensing and Regulation

Questions about 9700 Stonelake Blvd

What is being built at 9700 Stonelake Blvd?

Permits describe a remodel of an existing movie theater, not a new building. The work was planned in phases, and a separate 2026 permit covers replacing piping beneath the property.

Is a new movie theater opening at 9700 Stonelake Blvd?

The permits describe work on an existing movie theater. They do not identify a new theater opening.

What work is happening at 9700 Stonelake Blvd in Austin?

City of Austin permits describe phased theater remodeling, including work on theater areas and a later lobby revision. A plumbing permit filed October 30, 2026, describes replacing old cast-iron piping under the property.

When was the remodel at 9700 Stonelake Blvd permitted?

The records include phase 2 and phase 3 electrical permits dated February 17, 2025, and phase 4 permits dated July 1 and 8, 2025. A phase 5 revision was filed July 16, 2025.

What does permit 2026-141884 PP cover?

The City of Austin plumbing permit, filed October 30, 2026, describes a tunnel and trench through concrete to replace old cast-iron piping under the property.

What is being remodeled near Best Buy on Research Boulevard?

Permits for 9700 Stonelake Blvd, about 380 meters from Best Buy #203 at 9607 Research Blvd, describe phased remodeling of an existing movie theater.

Also being built nearby

All of 78759
Email me when it passes final inspection